🕷️ Crawler Inspector

URL Lookup

Direct Parameter Lookup

Raw Queries and Responses

1. Shard Calculation

Query:
Response:
Calculated Shard: 107 (from laksa139)

2. Crawled Status Check

Query:
Response:

3. Robots.txt Check

Query:
Response:

4. Spam/Ban Check

Query:
Response:

5. Seen Status Check

ℹ️ Skipped - page is already crawled

📄
INDEXABLE
CRAWLED
51 minutes ago
🤖
ROBOTS ALLOWED

Page Info Filters

FilterStatusConditionDetails
HTTP statusPASSdownload_http_code = 200HTTP 200
Age cutoffPASSdownload_stamp > now() - 6 MONTH0 months ago
History dropPASSisNull(history_drop_reason)No drop reason
Spam/banPASSfh_dont_index != 1 AND ml_spam_score = 0ml_spam_score=0
CanonicalPASSmeta_canonical IS NULL OR = '' OR = src_unparsedNot set

Page Details

PropertyValue
URLhttps://www.tripcheck.com/DynamicReports/Report/RoadConditions
Last Crawled2026-04-15 03:02:22 (51 minutes ago)
First Indexed2017-10-19 01:07:51 (8 years ago)
HTTP Status Code200
Meta TitleStatewide Oregon Road Conditions | TripCheck - Oregon Traveler Information
Meta Descriptionnull
Meta Canonicalnull
Boilerpipe Text
I-5: MP 26 to 28.4 I-5, Medford Commercial Vehicle Information Future Event: Informational only Expected Start Date 5/4/2026 12:00:00 AM Details Alert: I-5 NB MP 26.00 to MP 28.40 (Medford) Effective May 4, 2026, this section of I-5 northbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 7:00 PM and 7:00 AM. The estimated completion date for this work is May 4, 2026. Last Updated 4/14/2026 4:00 PM I-5: MP 26 to 28.4 I-5, Medford Commercial Vehicle Information Future Event: Informational only Expected Start Date 4/21/2026 12:00:00 AM Details Alert: I-5 NB MP 26.00 to MP 28.40 (Medford) Effective April 21, 2026, this section of I-5 northbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 7:00 PM and 7:00 AM. The estimated completion date for this work is April 24, 2026. Last Updated 4/14/2026 4:00 PM I-5: MP 26.8 to 27.2 I-5, Medford Commercial Vehicle Information Future Event: Informational only Expected Start Date 4/21/2026 12:00:00 AM Details Alert: I-5 NB Exit 27 off-ramp to Highland Drive/Garfield St (Medford) Effective April 21, 2026, the I-5 northbound Exit 27 off-ramp to Highland Drive/Garfield Street, will be closed Sunday through Thursday nights from 7:00 PM to 7:00 AM. The estimated completion date for this work is April 24, 2026. Last Updated 4/14/2026 4:00 PM I-5: MP 35.47 to 36.06 I-5, 2 miles North of Central Point Commercial Vehicle Information Future Event: Informational only Expected Start Date 5/4/2026 12:00:00 AM Details Alert: I-5 NB & SB MP 35.47 to MP 36.06 (Central Point) Effective May 4, 2026, this section of I-5 northbound and southbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 7:00 PM and 7:00 AM. The estimated completion date for this work is May 4, 2026. Last Updated 4/14/2026 4:00 PM I-5: MP 35.47 to 36.06 I-5, 2 miles North of Central Point Commercial Vehicle Information Future Event: Informational only Expected Start Date 4/19/2026 12:00:00 AM Details Alert: I-5 NB & SB MP 35.47 to MP 36.06 (Central Point) Effective April 19, 2026, this section of I-5 northbound and southbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 7:00 PM and 7:00 AM. The estimated completion date for this work is April 21, 2026. Last Updated 4/14/2026 4:00 PM I-5: MP 35.7 I-5, Intersection with Pacific Highway East ORE99E Commercial Vehicle Information Future Event: Informational only Expected Start Date 4/19/2026 12:00:00 AM Details Alert: I-5 NB Exit 35 on-ramp from OR140/Blackwell Rd (Central Point) Effective April 19, 2026, the I-5 northbound Exit 35 on-ramp from OR140/Blackwell Road, will be closed Sunday through Thursday nights from 7:00 PM to 7:00 AM. The estimated completion date for this work is April 21, 2026. Last Updated 4/14/2026 4:00 PM I-5: NB MP 58.18 to 66.7 I-5, Intersection with Pacific Highway ORE99 Construction Work Estimated delay under 20 minutes Lanes Affected (Southbound) , Shoulder (Northbound) , Shoulder Road construction is occurring. Prepare to slow. Watch for workers. Expect intermittent lane and shoulder closures Sunday – Friday from 7 a.m. – 7 p.m. <!--Links Start Here--> [Link to additional information](https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.oregon.gov%2Fodot%2Fprojects%2Fpages%2Fproject-details.aspx%3Fproject%3D21674&data=05%7C02%7CCarter.B.HARPER%40odot.oregon.gov%7C317a6bfac3c14ad58b8808de0b344b86%7C28b0d01346bc4a648d861c8a31cf590d%7C0%7C0%7C638960516398910346%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=k%2FDlSc6c62l%2F5z4iMoJ%2FdoDe40RmykdT3DPFi%2BolSjY%3D&reserved=0) Last Updated 4/02/2026 4:21 PM I-5: MP 58.3 I-5, Intersection with Pacific Highway ORE99 Commercial Vehicle Information Future Event: Informational only Expected Start Date 5/10/2026 12:00:00 AM Details Alert: I-5 SB Exit 58 off-ramp to OR99/US199/NE Scoville Rd (Grants Pass) Effective May 10, 2026, the I-5 southbound Exit 58 off-ramp to OR99/US199/NE Scoville Road will be closed Sunday through Friday from 7:00 PM to 7:00 AM. The estimated completion date for this work is May 14, 2026. Last Updated 4/14/2026 4:00 PM I-5: MP 58.52 to 61.68 I-5, Grants Pass Commercial Vehicle Information Informational only Details Alert: I-5 NB MP 58.52 to 61.68 (Grants Pass) Effective November 20, 2025, this section of I-5 northbound will be restricted to 12 feet 00 inches in width Sunday through Thursday nights between the hours of 7:00 pm and 7:00 am. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for more information. The estimated completion date for this work is October 15, 2026. Last Updated 4/14/2026 4:00 PM I-5: NB MP 59 to 61 I-5, Grants Pass Maintenance Work Estimated delay under 20 minutes Lanes Affected (Northbound) 1 Lane Road maintenance operations are occurring. Prepare to slow or move over for worker safety. Last Updated 4/14/2026 6:44 PM I-5: MP 59.94 I-5, 2 miles North of Grants Pass Commercial Vehicle Information Informational only Details Alert: I-5 SB MP 59.94 (Grants Pass) Effective January 1, 2026, this section of I-5 southbound will be restricted to 17 feet 1 inches in height Sunday through Thursday nights between the hours of 7:00 pm and 7:00 am. The estimated completion date for this work is October 15, 2026. Last Updated 4/14/2026 4:00 PM I-5: SB MP 61 to 59 I-5, 3 miles North of Grants Pass Maintenance Work No to Minimum Delay Road maintenance operations are occurring causing minimal delay to traffic. Prepare to slow or move over for worker safety. Last Updated 4/14/2026 7:30 PM I-5: MP 61 I-5, 3 miles North of Grants Pass Commercial Vehicle Information Future Event: Informational only Expected Start Date 4/26/2026 12:00:00 AM Details Alert: I-5 SB Exit 61 on-ramp from Monument Drive (Grants Pass) Effective April 26, 2026, the I-5 southbound Exit 61 on-ramp from Monument Drive, will be closed Sunday through Thursday nights from 7:00 PM to 7:00 AM. The estimated completion date for this work is May 1, 2026. Last Updated 4/14/2026 4:00 PM I-5: MP 62 to 58.17 I-5, 4 miles North of Grants Pass Commercial Vehicle Information Informational only Details Alert: I-5 SB MP 62.00 to 58.17 (Grants Pass) Effective January 1, 2026, this section of I-5 southbound will be restricted to 12 feet 00 inches in width Sunday through Thursday nights between the hours of 7:00 pm and 7:00 am. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for more information. The estimated completion date for this work is October 15, 2026. Last Updated 4/14/2026 4:00 PM I-5: NB MP 65 to 66 I-5, 7 miles North of Grants Pass Maintenance Work Estimated delay under 20 minutes Lanes Affected (Northbound) 1 Lane Road maintenance operations are occurring. Prepare to slow or move over for worker safety. Last Updated 4/14/2026 6:45 PM I-5: MP 66 I-5, 8 miles North of Grants Pass Commercial Vehicle Information Future Event: Informational only Expected Start Date 5/3/2026 12:00:00 AM Details Alert: I-5 NB Exit 66 off-ramp to Monument Dr (Grants Pass) Effective May 3, 2026, the I-5 northbound Exit 66 off-ramp to Monument Drive will be closed Sunday through Thursday nights from 7:00 PM to 7:00 AM. The estimated completion date for this work is May 8, 2026. Last Updated 4/14/2026 4:00 PM I-5: MP 66 I-5, 8 miles North of Grants Pass Commercial Vehicle Information Future Event: Informational only Expected Start Date 4/27/2026 12:00:00 AM Details Alert: I-5 SB Exit 66 on-ramp from Monument Drive (Grants Pass) Effective April 27, 2026, the I-5 southbound Exit 66 on-ramp from Monument Drive will be closed Monday through Thursday nights from 7:00 PM to 7:00 AM. The estimated completion date for this work is May 1, 2026. Last Updated 4/14/2026 4:00 PM I-5: SB MP 68 to 64 I-5, 8 miles South of Wolf Creek Maintenance Work Estimated delay under 20 minutes Lanes Affected (Southbound) 1 Lane Road maintenance operations are occurring. Prepare to slow or move over for worker safety. Last Updated 4/14/2026 6:45 PM I-5: SB MP 103 I-5, 5 miles North of Canyonville Maintenance Work Closure Off Ramp Road maintenance operations are occurring. Use an alternate route. Ramps Affected. Last Updated 4/14/2026 6:33 PM I-5: MP 119.3 to 119.7 I-5, Intersection with Coos Bay - Roseburg Highway ORE42 Commercial Vehicle Information Future Event: Informational only Expected Start Date 4/26/2026 12:00:00 AM Details Alert: I-5 SB Exit 119 on/off-ramps to/from OR42 (Winston) Effective April 26, 2026, the I-5 southbound Exit 119 on/off ramps to/from OR42 will be intermittently closed Sunday through Thursday nights between the hours of 6:00 PM and 6:00 AM. The estimated completion date for this work is May 13, 2026. Last Updated 4/14/2026 4:00 PM I-5: MP 119.7 to 119.9 I-5, 5 miles South of Roseburg Commercial Vehicle Information Future Event: Informational only Expected Start Date 4/26/2026 12:00:00 AM Details Alert: I-5 NB Exit 119 on/off-ramps to/from OR42 (Winston) Effective April 26, 2026, the I-5 northbound Exit 119 on/off ramps to/from OR42 will be intermittently closed Sunday through Thursday nights between the hours of 6:00 PM and 6:00 AM. The estimated completion date for this work is May 13, 2026. Last Updated 4/14/2026 4:00 PM I-5: MP 235.73 I-5, 2 miles North of Albany Commercial Vehicle Information Future Event: Informational only Expected Start Date 5/4/2026 12:00:00 AM Details Alert: Century Dr/I-5 Frontage Rd NB & SB 235.73 (Murder Creek Bridge - Millersburg) Effective May 4, 2026, this section of Century Drive/I-5 Frontage Road northbound and southbound will be restricted to 12 feet 00 inches in width Monday through Thursday between the hours of 7:00 AM and 4:30 PM. The estimated completion date for this work is May 21, 2026. Last Updated 4/14/2026 4:00 PM I-5: NB MP 248.35 I-5, 6 miles South of Intersection with ORE22, in Salem Construction Work Future Event: No to Minimum Delay Expected Start Date 4/14/2026 9:00:00 PM Lanes Affected (Northbound) 1 Lane Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Last Updated 4/09/2026 6:02 PM I-5: NB MP 248.42 to 248.73 I-5, 6 miles South of Intersection with ORE22, in Salem Construction Work Informational only On Ramp Road construction is or will be occurring. Use caution. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. Southbound I-5 traffic to be shifted onto the former northbound lanes. Northbound I-5 traffic to use Exit 249 and the former I-5 on-ramp as the new northbound lanes. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929) Last Updated 3/30/2026 6:19 PM I-5: NB MP 248.65 to 249.73 I-5, 5 miles South of Intersection with ORE22, in Salem Construction Work Informational only Off Ramp Road construction is or will be occurring. Use caution. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. Southbound I-5 traffic to be shifted onto the former northbound lanes. Northbound I-5 traffic to use Exit 249 and the former I-5 on-ramp as the new northbound lanes. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929) Last Updated 3/30/2026 6:19 PM I-5: NB MP 248.69 I-5, 5 miles South of Intersection with ORE22, in Salem Construction Work No to Minimum Delay Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929) Last Updated 3/30/2026 6:19 PM I-5: NB MP 249.08 to 249.85 I-5, 5 miles South of Intersection with ORE22, in Salem Construction Work Informational only On Ramp Road construction is or will be occurring. Use caution. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. Southbound I-5 traffic to be shifted onto the former northbound lanes. Northbound I-5 traffic to use Exit 249 and the former I-5 on-ramp as the new northbound lanes. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929) Last Updated 2/12/2026 4:28 PM I-5: MP 251.79 to 248.15 I-5, 2 miles South of Intersection with ORE22, in Salem Commercial Vehicle Information Informational only Details Alert: I-5 NB & SB MP 248.00 to MP 252.00 (Salem) Effective August 29, 2024, this section of I-5 northbound and southbound will be intermittently restricted to 16 feet 00 inches in width Sunday through Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this work is February 28, 2027. Last Updated 4/14/2026 4:00 PM I-5: NB MP 277.39 to 279.45 I-5, 5 miles North of Woodburn Construction Work Estimated delay under 20 minutes Road construction is occurring. Prepare to slow. Watch for workers. Crews working daily, Sunday through Thursday with occasional night and weekend work. Up to two lanes closed nightly in either direction on I-5 from 8 p.m. to 8 a.m. Other roads in the project area to have single lane closures as needed from 9 p.m. to 6 a.m. Reduced speed to 55 mph in the work zone. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22505) Last Updated 4/10/2026 4:12 AM I-5: SB MP 297 to 300 I-5, Portland, Intersection with SW Terwilliger Blvd Construction Work Estimated delay under 20 minutes No traffic impacts. ODOT is installing RealTime Variable Advisory Speed (VAS) signs along a busy stretch of Interstate 5 through south Portland from the Ross Island Bridge to Terwilliger Boulevard. Realtime VAS signs give drivers notice to slow down before they reach a problem area — improving traffic flow and helping to reduce rear-end crashes and congestion. <!--Links Start Here--> [Link to Additional Information](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21602) Last Updated 4/03/2026 3:49 PM I-5: MP 301.35 to 300.89 I-5, Interstate 84 Commercial Vehicle Information Future Event: Informational only Expected Start Date 4/27/2026 12:00:00 AM Details Alert: I-5 SB MP 301.06 (Portland) Effective April 27, 2026, this section of I-5 southbound will be restricted to 14 feet 11 inches in height Sunday through Thursday nights between 10 PM & 5 AM, and Friday through Saturday nights between 10 PM & 6 AM. The estimated completion date for this work is May 18, 2026. Last Updated 4/14/2026 4:00 PM I-5: MP 301.35 to 300.89 I-5, Interstate 84 Commercial Vehicle Information Future Event: Informational only Expected Start Date 4/27/2026 12:00:00 AM Details Alert: I-5 SB MP 301.35 to MP 300.89 (Portland) Effective April 27, 2026, this section of I-5 southbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between 10 PM & 5 AM, and Friday through Saturday nights between 10 PM & 6 AM. The estimated completion date for this work is May 18, 2026. Last Updated 4/14/2026 4:00 PM I-5: MP 301.5 to 302.7 I-5, 1 mile South of I-405 North Interchange Commercial Vehicle Information Informational only Details Alert: I-5 SB MP 302.70 to MP 301.50 (Portland) Effective January 30, 2026, this section of I-5 southbound will be restricted to 14 feet 00 inches in Sunday night thru Friday night between the hours of 10 PM and 5 AM and Saturday night between the hours of 10:PM and 8:AM. Loads wider than 14 feet 00 inches may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is May 9, 2026. Last Updated 4/14/2026 4:00 PM I-5: MP 301.58 I-5, I-405 North Interchange Commercial Vehicle Information Informational only Details Alert: I-5 SB MP 301.58 (Portland) Effective March 11, 2026, this section of I-5 southbound will be restricted to 14 feet 7 inches in height Sunday through Thursday nights between the hours of 10 PM and 5 AM. Loads over 14 feet 7 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is April 30, 2026. Last Updated 4/14/2026 4:00 PM I-5: MP 301.59 to 301.96 I-5, I-405 North Interchange Commercial Vehicle Information Future Event: Informational only Expected Start Date 4/20/2026 12:00:00 AM Details Alert: I-5 NB MP 301.59 to MP 301.96 (Portland) Effective April 20, 2026, this section of I-5 northbound will be restricted to 14 feet 00 inches in width Monday through Friday nights between the hours of 10 PM and 5 AM. Loads wider than 14 feet 00 inches may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is May 8, 2026. Last Updated 4/14/2026 4:00 PM I-5: MP 301.6 to 302.8 I-5, I-405 North Interchange Commercial Vehicle Information Informational only Details Alert: I-5 SB MP 302.33 (Portland) Effective January 30, 2026, this section of I-5 southbound will be restricted to 16 feet 2 inches in height Sunday through Thursday nights between the hours of 10 PM and 5 AM. Loads over 16 feet 2 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is April 30, 2026. Last Updated 4/14/2026 4:00 PM I-5: SB MP 301.85 to 301.72 I-5, I-405 North Interchange Construction Work No to Minimum Delay Intermittent nighttime lane closures on I-5 SB from the Convention Center to Burnside from 9 p.m. to 6 a.m. weather permitting. No detours required. We are improving safety and congestion where I-5, I-84 and I-405 converge and reconnecting the Albina neighborhood by constructing a highway cover over a portion of I-5. From summer 2025 through late 2026, we are constructing new stormwater facilities, repairing the concrete deck in a section of I-5 completing a seismic retrofit, extending an existing merging lane on SB I-5, and constructing a new sign structure. <!--Links Start Here--> [Link to Additional Information](https://i5rosequarter.org/current-construction-travel-impacts/) Last Updated 4/03/2026 4:28 PM I-5: MP 302.4 to 302 I-5, I-405 North Interchange Commercial Vehicle Information Informational only Details Alert: I-5 NB MP 302.4 to MP 302.6 (Portland) Effective April 12, 2026, this section of I-5 northbound will be restricted to 12 feet 00 inches in width at night between the hours of 10 PM & 5 AM. Loads wider than 12 feet 00 inches may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is April 16, 2026. Last Updated 4/14/2026 4:00 PM I-5: MP 302.4 I-5, I-405 North Interchange Commercial Vehicle Information Future Event: Informational only Expected Start Date 4/22/2026 12:00:00 AM Details Alert: I-5 NB on-ramp from NE Broadway (Portland) Effective April 22, 2026, the I-5 northbound on-ramp from NE Broadway will be restricted to 12 feet 00 inches in width at night between the hours of 10 PM & 5 AM. Loads wider than 12 feet 00 inches may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is April 26, 2026. Last Updated 4/14/2026 4:00 PM I-5: MP 303.37 to 302.28 I-5, 1 mile South of Portland, Intersection with Going St Commercial Vehicle Information Future Event: Informational only Expected Start Date 4/16/2026 12:00:00 AM Details Alert: I-5 SB MP 303.161 (Portland) Effective April 16, 2026, this section of I-5 southbound will be restricted to 15 feet 5 inches in height at night between the hours 10 PM & 5 AM. Loads wider than 12 feet 00 inches may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is April 22, 2026. Last Updated 4/14/2026 4:00 PM I-5: MP 303.37 to 302.28 I-5, 1 mile South of Portland, Intersection with Going St Commercial Vehicle Information Future Event: Informational only Expected Start Date 4/16/2026 12:00:00 AM Details Alert: I-5 SB MP 303.37 to MP 302.28 (Portland) Effective April 16, 2026, this section of I-5 southbound will be restricted to 12 feet 00 inches in width at night between the hours 10 PM & 5 AM. Loads wider than 12 feet 00 inches may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is April 22, 2026. Last Updated 4/14/2026 4:00 PM
Markdown
[Skip Navigation](https://www.tripcheck.com/DynamicReports/Report/RoadConditions#content) [TripCheck](https://www.tripcheck.com/ "Go to TripCheck Home Page") - [Road & Weather](https://www.tripcheck.com/) - [Road Conditions Map](https://www.tripcheck.com/) - [NOAA Forecasts](https://www.tripcheck.com/Pages/NOAA-Forecasts "National Oceanic and Atmospheric Administration Forecasts") - [Custom Cameras](https://www.tripcheck.com/Pages/Custom-Cameras) - [Trucking Center](https://www.tripcheck.com/Pages/Trucking-Center) - [Winter Travel](https://www.tripcheck.com/DynamicReports/Report/RoadConditions) - [Chain Law](https://www.tripcheck.com/Pages/Chain-Law) - [Traction Tires](https://www.tripcheck.com/Pages/Traction-Tires) - [Minimum Chain Requirements](https://www.tripcheck.com/Pages/Minimum-Chain-Requirements) - [Winter Road Maintenance](https://www.tripcheck.com/Pages/Winter-Road-Maintenance) - [Winter Driving Safety](https://www.oregon.gov/ODOT/COMM/Pages/winterdriving.aspx) - [Winter Driving Guide](https://www.oregon.gov/ODOT/Documents/winter-driving-guide.pdf) - [Other State Links](https://www.tripcheck.com/DynamicReports/Report/RoadConditions) - [California](http://quickmap.dot.ca.gov/) - [Idaho](https://511.idaho.gov/) - [Nevada](https://www.nevadadot.com/traveler) - [Washington](https://www.wsdot.com/traffic/) - [Text Reports](https://www.tripcheck.com/DynamicReports/Report/RoadConditions) - [Road Conditions](https://www.tripcheck.com/DynamicReports/Report/RoadConditions) - [Local Events](https://www.tripcheck.com/DynamicReports/Report/LocalEvents) - [NOAA Forecasts](https://www.tripcheck.com/DynamicReports/Report/NoaaForecasts) - [Weather Stations](https://www.tripcheck.com/DynamicReports/Report/WeatherStations) - [Cameras](https://www.tripcheck.com/DynamicReports/Report/Cameras) - [Travel Time](https://www.tripcheck.com/DynamicReports/Report/TravelTime) - [Printable Condition Report](https://www.tripcheck.com/Reports/PrintableConditionReport.pdf?v=887279168) - [Travel Center](https://www.tripcheck.com/Pages/Rest-Areas) - [Rest Areas](https://www.tripcheck.com/Pages/Rest-Areas) - [Rest Areas Map](https://www.tripcheck.com/Pages/Rest-Areas) - [Rest Areas Rules of Use](https://www.tripcheck.com/Pages/Rest-Areas-Regulations) - [Rest Areas Highway Signs](https://www.tripcheck.com/Pages/Rest-Areas-Highway-Signs) - [Sno-Parks](https://www.tripcheck.com/Pages/Sno-Parks) - [Sno-Parks](https://www.tripcheck.com/Pages/Sno-Parks) - [Sno-Park Permits](https://www.tripcheck.com/Pages/Sno-Parks-Permits) - [Sno-Park Permit Vendors](https://dmv2u.oregon.gov/eServices/_/?link=snosearch) - [Scenic Byways](https://www.tripcheck.com/Pages/Scenic-Byways) - [Transit & More](https://www.tripcheck.com/Pages/Transit-More) - [Transit Directory](https://www.oregon.gov/ODOT/RPTD/Pages/Oregon-Transit-Providers.aspx) - [Transit & More](https://www.tripcheck.com/Pages/Transit-More) - [Bicycling & Walking](https://www.tripcheck.com/Pages/Bicycling-Walking) - [Park & Ride](https://www.tripcheck.com/Pages/Park-Ride) - [Commuting / Carpool](https://www.tripcheck.com/Pages/Commuting-Carpool) - [Car Sharing](https://www.tripcheck.com/Pages/Car-Sharing) - [Passenger Rail](https://www.tripcheck.com/Pages/Passenger-Rail) - [Airports](https://www.tripcheck.com/Pages/Airports) - [About TripCheck](https://www.tripcheck.com/Pages/New-Features) - [New Features](https://www.tripcheck.com/Pages/New-Features) - [Director's Message](https://www.tripcheck.com/Pages/Message-From-The-Director) - [Frequently Asked Questions](https://www.tripcheck.com/Pages/Frequently-Asked-Questions) - [Related Links](https://www.tripcheck.com/Pages/Links) - [On the Go](https://www.tripcheck.com/Pages/Mobile-511) - [511](https://www.tripcheck.com/Pages/511) - [ODOT RealTime](https://www.tripcheck.com/RealTime) - [TripCheck TV](https://www.tripcheck.com/tv/) - [TripCheck on X](https://www.tripcheck.com/Pages/TripCheck-On-X) - [TripCheck Data/API](https://www.tripcheck.com/Pages/API) - [Contact Us](https://www.tripcheck.com/Pages/Contact) ### Regions - [Statewide](https://www.tripcheck.com/DynamicReports/Report/RoadConditions/0) - [Northwest](https://www.tripcheck.com/DynamicReports/Report/RoadConditions/1) - [North](https://www.tripcheck.com/DynamicReports/Report/RoadConditions/2) - [Northeast](https://www.tripcheck.com/DynamicReports/Report/RoadConditions/3) - [West](https://www.tripcheck.com/DynamicReports/Report/RoadConditions/4) - [Central](https://www.tripcheck.com/DynamicReports/Report/RoadConditions/5) - [East](https://www.tripcheck.com/DynamicReports/Report/RoadConditions/6) - [Southwest](https://www.tripcheck.com/DynamicReports/Report/RoadConditions/7) - [South](https://www.tripcheck.com/DynamicReports/Report/RoadConditions/8) - [Southeast](https://www.tripcheck.com/DynamicReports/Report/RoadConditions/9) ### Cities - [Bend](https://www.tripcheck.com/DynamicReports/Report/RoadConditions/10) - [Eugene](https://www.tripcheck.com/DynamicReports/Report/RoadConditions/11) - [La Grande](https://www.tripcheck.com/DynamicReports/Report/RoadConditions/12) - [Medford](https://www.tripcheck.com/DynamicReports/Report/RoadConditions/13) - [Portland](https://www.tripcheck.com/DynamicReports/Report/RoadConditions/16) - [Portland Metro](https://www.tripcheck.com/DynamicReports/Report/RoadConditions/14) - [Salem](https://www.tripcheck.com/DynamicReports/Report/RoadConditions/15) ### Related Links - [California State Traveler Info](http://www.dot.ca.gov/hq/roadinfo/) - [Idaho State Traveler Info](http://511.idaho.gov/) - [Nevada State Traveler Info](http://www.nevadadot.com/traveler) - [Washington State Traveler Info](http://www.wsdot.com/traffic) # Statewide Oregon Road Conditions Highways with no adverse conditions do not show up on this report. Expand All Collapse All ## Current Travel Conditions By Route ### [Alerts\!]() #### Closure with Detour #### ORE224, 1 mile East of Intersection with Pacific Highway East ORE 99E (McLoughlin Blvd) MP 1 ##### Roadwork has the Westbound right turn lane to Monroe closed, use alternate route. Updated 4/8/2026 1:41:00 PM #### Closure #### ORE229, 10 miles North of Siletz MP 14 - 15 ##### A landslide has occurred. Use an alternate route. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/Regions/Pages/OR229.aspx) Updated 4/11/2026 10:34:00 PM #### Closure #### HWY100, 4 miles West of Ainsworth State Park MP 18 - 20 ##### A section of the Historic Columbia River Highway/U.S. 30 between Multnomah Falls and Oneonta Trailhead is closed to all users until Spring 2026. I-84 is open. Use I-84 Exit 31 or take transit to visit Multnomah Falls. There is no vehicle, pedestrian or bicycle access to Multnomah Falls heading westbound on the Historic Highway from Exit 35. The Oneonta trailhead is open to hikers, with limited parking. Project Description: Two 100 year-old elevated roadways that provide access to Multnomah Falls require repairs to continue providing access to one of Oregon's most iconic sites. The elevated roadways – called viaducts – carry vehicles and bicycles to the Falls and Lodge from the Historic Columbia River Highway. The east viaduct will be closed fall 2025 through spring 2026. Restoration work to the west viaduct on the Historic Columbia River Highway (U.S. 30) between Wahkeena Falls and Multnomah Falls was completed in May 2025. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=17479) Updated 4/3/2026 7:47:00 PM #### Conditional Closure #### US30, 6 miles West of The Dalles MP 67 - 69 ##### The highway is open to local traffic and local deliveries only. No through traffic allowed. Updated 4/13/2026 7:03:00 AM #### Weather Alert #### Clackamas County Cascade Foothills ##### Winter Weather Advisory NOAA Issue Date: 4/14/2026 12:46:00 PM What Snow expected above 1500 ft. Total snow accumulations 1 to 4 inches. Highest accumulations above 1500 ft. Winds gusting as high as 40 MPH. Where Clackamas county Cascade foothills. When From 3 AM to 11 AM PDT Wednesday. Impacts Roads, and especially bridges and overpasses, will likely become slick and hazardous. Additional details ... 1 to 4 inches for elevations above 1500 ft, including Mt. Hood village and Zigzag, or. 1 inch or less for locations around 1000 ft, including Sandy, or. Precautionary/preparedness actions... Have a winter emergency driving kit readily available. Common items to include: flashlight, batteries, blankets, a shovel, water, non-perishable food items, tire chains, etc. Be aware that walking surfaces may be slick. Walk with extra care. For the latest road conditions and chain restrictions in Oregon, call 5 1 1, or visit: www.tripcheck.com. #### Weather Alert #### North Oregon Cascades, Cascades of Marion and Linn Counties, Cascades of Lane County, South Washington Cascades ##### Winter Storm Warning NOAA Issue Date: 4/14/2026 12:46:00 PM What Heavy snow above 2500 ft. Total snow accumulations between 12 to 22 inches. Winds could gust as high as 45 MPH. Where South Washington Cascades and the northern and central Cascades of Oregon. When From 5 PM this afternoon to 5 AM PDT Thursday. Impacts Roads, and especially bridges and overpasses, will likely become slick and hazardous. Additional details Latest guidance suggests the heaviest snow accumulations are forecast over the Cascades from Marion to Lane counties. Precautionary/preparedness actions... Consider postponing travel until weather conditions improve. If you must travel, be sure to slow down and allow extra time. If your car becomes trapped in deep snow, be sure to keep your car off to stay safe from potential carbon monoxide poisoning. Be aware that walking surfaces may be slick. Walk with extra care. Backcountry recreation is not advised. #### Weather Alert #### South Central Cascades ##### Winter Weather Advisory NOAA Issue Date: 4/14/2026 11:49:00 AM What Total snow accumulations 4 to 12 inches. Winds gusting as high as 45 MPH over high and exposed terrain. Where Above 4000 ft in the high south central Cascades in Klamath, Jackson and Douglas counties. Including the locations of ... Crescent Lake, Diamond Lake. This also includes the following passes or notable locations ... Diamond Lake junction on state highways 230 & 138 at 4478 ft. Willamette Pass on state highway 58 at 5090 ft. When From 11 PM this evening to 5 AM PDT Thursday. Impacts Travel may be difficult and there may be delays in your commute. The hazardous conditions could impact the Wednesday morning and evening commutes. Gusty winds could bring down tree branches. Additional details Visit weather. Gov/mfr/winter for additional snow probabilities Precautionary/preparedness actions... Slow down and use caution while traveling. Call 511 or visit tripcheck. Com for road information. #### Weather Alert #### North Blue Mnts, WA-Northwest Blue Mnts ##### Winter Weather Advisory NOAA Issue Date: 4/14/2026 10:08:00 AM What Snow expected. Total snow accumulations of 5 to 10 inches above 4000 feet. Winds gusting as high as 35 MPH. Where In Oregon, northern Blue Mountains of Oregon. In Washington, northwest Blue Mountains. When From 5 PM this afternoon to 11 PM PDT Wednesday. Impacts Periods of moderate and heavy snow will combine with low visibilities to create difficult driving conditions. Additional details Lighter snowfall amounts are forecast below 4000 feet along i-84 and or 204. Steady snowfall this evening through Wednesday morning will turn over to snow showers late Wednesday afternoon. Heaviest snowfall rates are expected Wednesday morning and early afternoon. Precautionary/preparedness actions... Slow down and use caution while traveling. In Oregon, the latest road conditions can be obtained by visiting tripcheck. Com online, or by calling 5 1 1. In Washington, the latest road conditions can be obtained by visiting the website wsdot. WA. Gov/travel. #### Weather Alert #### East Slopes of the Cascades ##### Winter Storm Warning NOAA Issue Date: 4/14/2026 10:08:00 AM What Heavy snow expected. Total snow accumulations of 6 to 12 inches above 4000 feet with locally higher amounts along the Cascade crest. Winds gusting as high as 45 MPH. Where East slopes of the Oregon Cascades. When From 5 PM this afternoon to 5 AM PDT Thursday. Impacts Significant snowfall with periods of heavy snowfall rates will combine with low visibility to create very difficult driving conditions. Gusty winds could bring down tree branches. Additional details Lighter snowfall is forecast below 4000 feet along us 97, us 26, and us 20. Steady snowfall late this afternoon into Wednesday morning will turn over to snow showers Wednesday afternoon. Precautionary/preparedness actions... Persons should consider delaying all travel. If travel is absolutely necessary, drive with extreme caution. Consider taking a winter storm kit along with you, including such items as tire chains, booster cables, flashlight, shovel, blankets and extra clothing. Also take water, a first aid kit, and anything else that would help you survive in case you become stranded. Do not touch downed lines and report any Power outages to your electric company. Travel is highly discouraged due to slick roadways and the possibility of downed trees and Power lines. #### Weather Alert #### Foothills of the Northern Blue Mountains, Kittitas Valley, WA-Yakima Valley ##### Freeze Watch NOAA Issue Date: 4/14/2026 09:55:00 AM What Sub-freezing temperatures as low as 28 possible. Where In Oregon, foothills of the northern Blue Mountains of Oregon. In Washington, Kittitas Valley and Yakima Valley. When From Wednesday evening through Thursday morning. Impacts Frost and freeze conditions could kill crops, other sensitive vegetation and possibly damage unprotected outdoor plumbing. Precautionary/preparedness actions... Take steps now to protect tender plants from the cold. #### Weather Alert #### North & East Klamath Co. & West Lake Co., Central & East Lake Co. ##### Wind Advisory NOAA Issue Date: 4/14/2026 09:35:00 AM What Southwest winds 30 to 40 MPH with gusts up to 55 MPH expected. Where Portions of Lake, Modoc, and far eastern Klamath counties, including mostly the higher terrain of winter rim, the warner and hart mountains, but also including Paisley, summer Lake, Valley falls, Wagontire, and parts of highways 140, 395, 31 and 299. When From 11 AM to 8 PM PDT Wednesday. Impacts Gusty winds will blow around unsecured objects and a few Power outages may result. Precautionary/preparedness actions... Winds this strong can make driving difficult, especially for high profile vehicles. Use extra caution. Secure light outdoor objects like tents or empty trash bins. ### [I-205]() #### I-205: MP 8.56 to 9.56 I-205, OR 99E ##### Commercial Vehicle Information ##### Informational only Details Alert: I-205 NB MP 8.56 to MP 9.56 (Oregon City) Effective, February 25, 2026, this section of I-205 northbound will be restricted to 18 feet 00 inches in width Monday through Thursday nights between the hours of 10 PM and 5 AM and Friday nights between the hours of 10 PM and 7 AM and Saturday nights between the hours of 10 PM and 8 AM. The estimated completion date for this work is May 9, 2026 Last Updated 4/14/2026 4:00 PM #### I-205: MP 8.56 to 9.9 I-205, OR 99E ##### Commercial Vehicle Information ##### Informational only Details Alert: I-205 SB MP 8.56 to MP 9.90 (Oregon City) Effective March 2, 2026, this section of I-205 southbound will be intermittently restricted to 18 feet 00 inches in width Monday through Thursday nights between the hours of 10 PM and 5 AM. The estimated completion date for this work is May 9, 2026 Last Updated 4/14/2026 4:00 PM #### I-205: SB MP 8.8 to 9.3 I-205, OR 99E ##### Construction Work ##### Estimated delay under 20 minutes Comments Nighttime lane and ramp closures in Oregon City and West Linn with pedestrian detours on OR 43 and OR 99E between 8 p.m. and 6 a.m. The I-205 Improvements Project is upgrading the Abernethy Bridge — a critical link on I-205 connecting West Linn and Oregon City — to withstand a major earthquake. We are also realigning I-205 interchanges at OR 43 and OR 99E, making safety improvements for people biking, walking and rolling and building a new sound wall in Oregon City. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.i205corridor.org/updates) Last Updated 4/03/2026 6:13 PM #### I-205: MP 9.01 I-205, OR 99E ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 4/27/2026 12:00:00 AM Details Alert: I-205 SB Exit 8 off-ramp to OR43 (West Linn) Effective April 27, 2026, the I-205 southbound Exit 8 off-ramp to OR43 southbound will be intermittently closed Monday through Thursday nights between the hours of 10 PM and 5 AM. The estimated completion date for this work is May 9, 2026. Last Updated 4/14/2026 4:00 PM #### I-205: MP 9.23 I-205, OR 99E ##### Commercial Vehicle Information ##### Informational only Details Alert: I-205 NB Exit 9 off-ramp to OR99E NB (Oregon City) Effective February 25, 2026, the I-205 northbound Exit 9 off-ramp to OR99E northbound will be closed Monday through Thursday night between the hours of 10 PM and 5 AM and Friday night between the hours of 10 PM and 7 AM and Saturday night between the hours of 10 PM and 8 AM. The estimated completion date for this work is May 9, 2026. Last Updated 4/14/2026 4:00 PM #### I-205: MP 9.56 I-205, OR 213 Park Place ##### Commercial Vehicle Information ##### Informational only Details Alert: I-205 SB Exit 9 off-ramp to OR99E (Oregon City) Effective April 6, 2026, the I-205 southbound Exit 9 off-ramp to OR99E will be intermittently restricted to 9 feet 00 inches in width Monday through Thursday nights between the hours of 10 PM and 5 AM. Loads over 9 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is May 8, 2026. Last Updated 4/14/2026 4:00 PM ### [I-405]() #### I-405: MP 1.6 to 1.94 I-405, Intersection with US26 ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 6/6/2026 12:00:00 AM Details Alert: I-405 NB Exit 2A off-ramp to Salmon St/Providence Park (Portland) Effective June 6, 2026, the I-405 northbound Exit 2A off-ramp to Salmon Street/Providence Park will be closed between the hours of 4:30 PM & 11:30 PM. The estimated completion date for this work is June 6, 2026. Last Updated 4/14/2026 4:00 PM ### [I-5]() #### I-5: MP 26 to 28.4 I-5, Medford ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 5/4/2026 12:00:00 AM Details Alert: I-5 NB MP 26.00 to MP 28.40 (Medford) Effective May 4, 2026, this section of I-5 northbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 7:00 PM and 7:00 AM. The estimated completion date for this work is May 4, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: MP 26 to 28.4 I-5, Medford ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 4/21/2026 12:00:00 AM Details Alert: I-5 NB MP 26.00 to MP 28.40 (Medford) Effective April 21, 2026, this section of I-5 northbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 7:00 PM and 7:00 AM. The estimated completion date for this work is April 24, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: MP 26.8 to 27.2 I-5, Medford ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 4/21/2026 12:00:00 AM Details Alert: I-5 NB Exit 27 off-ramp to Highland Drive/Garfield St (Medford) Effective April 21, 2026, the I-5 northbound Exit 27 off-ramp to Highland Drive/Garfield Street, will be closed Sunday through Thursday nights from 7:00 PM to 7:00 AM. The estimated completion date for this work is April 24, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: MP 35.47 to 36.06 I-5, 2 miles North of Central Point ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 5/4/2026 12:00:00 AM Details Alert: I-5 NB & SB MP 35.47 to MP 36.06 (Central Point) Effective May 4, 2026, this section of I-5 northbound and southbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 7:00 PM and 7:00 AM. The estimated completion date for this work is May 4, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: MP 35.47 to 36.06 I-5, 2 miles North of Central Point ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 4/19/2026 12:00:00 AM Details Alert: I-5 NB & SB MP 35.47 to MP 36.06 (Central Point) Effective April 19, 2026, this section of I-5 northbound and southbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 7:00 PM and 7:00 AM. The estimated completion date for this work is April 21, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: MP 35.7 I-5, Intersection with Pacific Highway East ORE99E ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 4/19/2026 12:00:00 AM Details Alert: I-5 NB Exit 35 on-ramp from OR140/Blackwell Rd (Central Point) Effective April 19, 2026, the I-5 northbound Exit 35 on-ramp from OR140/Blackwell Road, will be closed Sunday through Thursday nights from 7:00 PM to 7:00 AM. The estimated completion date for this work is April 21, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: NB MP 58.18 to 66.7 I-5, Intersection with Pacific Highway ORE99 ##### Construction Work ##### Estimated delay under 20 minutes Lanes Affected (Southbound) , Shoulder (Northbound) , Shoulder Comments Road construction is occurring. Prepare to slow. Watch for workers. Expect intermittent lane and shoulder closures Sunday – Friday from 7 a.m. – 7 p.m. \<!--Links Start Here--\> \[Link to additional information\](https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.oregon.gov%2Fodot%2Fprojects%2Fpages%2Fproject-details.aspx%3Fproject%3D21674\&data=05%7C02%7CCarter.B.HARPER%40odot.oregon.gov%7C317a6bfac3c14ad58b8808de0b344b86%7C28b0d01346bc4a648d861c8a31cf590d%7C0%7C0%7C638960516398910346%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C\&sdata=k%2FDlSc6c62l%2F5z4iMoJ%2FdoDe40RmykdT3DPFi%2BolSjY%3D\&reserved=0) Last Updated 4/02/2026 4:21 PM #### I-5: MP 58.3 I-5, Intersection with Pacific Highway ORE99 ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 5/10/2026 12:00:00 AM Details Alert: I-5 SB Exit 58 off-ramp to OR99/US199/NE Scoville Rd (Grants Pass) Effective May 10, 2026, the I-5 southbound Exit 58 off-ramp to OR99/US199/NE Scoville Road will be closed Sunday through Friday from 7:00 PM to 7:00 AM. The estimated completion date for this work is May 14, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: MP 58.52 to 61.68 I-5, Grants Pass ##### Commercial Vehicle Information ##### Informational only Details Alert: I-5 NB MP 58.52 to 61.68 (Grants Pass) Effective November 20, 2025, this section of I-5 northbound will be restricted to 12 feet 00 inches in width Sunday through Thursday nights between the hours of 7:00 pm and 7:00 am. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for more information. The estimated completion date for this work is October 15, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: NB MP 59 to 61 I-5, Grants Pass ##### Maintenance Work ##### Estimated delay under 20 minutes Lanes Affected (Northbound) 1 Lane Comments Road maintenance operations are occurring. Prepare to slow or move over for worker safety. Last Updated 4/14/2026 6:44 PM #### I-5: MP 59.94 I-5, 2 miles North of Grants Pass ##### Commercial Vehicle Information ##### Informational only Details Alert: I-5 SB MP 59.94 (Grants Pass) Effective January 1, 2026, this section of I-5 southbound will be restricted to 17 feet 1 inches in height Sunday through Thursday nights between the hours of 7:00 pm and 7:00 am. The estimated completion date for this work is October 15, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: SB MP 61 to 59 I-5, 3 miles North of Grants Pass ##### Maintenance Work ##### No to Minimum Delay Comments Road maintenance operations are occurring causing minimal delay to traffic. Prepare to slow or move over for worker safety. Last Updated 4/14/2026 7:30 PM #### I-5: MP 61 I-5, 3 miles North of Grants Pass ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 4/26/2026 12:00:00 AM Details Alert: I-5 SB Exit 61 on-ramp from Monument Drive (Grants Pass) Effective April 26, 2026, the I-5 southbound Exit 61 on-ramp from Monument Drive, will be closed Sunday through Thursday nights from 7:00 PM to 7:00 AM. The estimated completion date for this work is May 1, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: MP 62 to 58.17 I-5, 4 miles North of Grants Pass ##### Commercial Vehicle Information ##### Informational only Details Alert: I-5 SB MP 62.00 to 58.17 (Grants Pass) Effective January 1, 2026, this section of I-5 southbound will be restricted to 12 feet 00 inches in width Sunday through Thursday nights between the hours of 7:00 pm and 7:00 am. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for more information. The estimated completion date for this work is October 15, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: NB MP 65 to 66 I-5, 7 miles North of Grants Pass ##### Maintenance Work ##### Estimated delay under 20 minutes Lanes Affected (Northbound) 1 Lane Comments Road maintenance operations are occurring. Prepare to slow or move over for worker safety. Last Updated 4/14/2026 6:45 PM #### I-5: MP 66 I-5, 8 miles North of Grants Pass ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 5/3/2026 12:00:00 AM Details Alert: I-5 NB Exit 66 off-ramp to Monument Dr (Grants Pass) Effective May 3, 2026, the I-5 northbound Exit 66 off-ramp to Monument Drive will be closed Sunday through Thursday nights from 7:00 PM to 7:00 AM. The estimated completion date for this work is May 8, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: MP 66 I-5, 8 miles North of Grants Pass ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 4/27/2026 12:00:00 AM Details Alert: I-5 SB Exit 66 on-ramp from Monument Drive (Grants Pass) Effective April 27, 2026, the I-5 southbound Exit 66 on-ramp from Monument Drive will be closed Monday through Thursday nights from 7:00 PM to 7:00 AM. The estimated completion date for this work is May 1, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: SB MP 68 to 64 I-5, 8 miles South of Wolf Creek ##### Maintenance Work ##### Estimated delay under 20 minutes Lanes Affected (Southbound) 1 Lane Comments Road maintenance operations are occurring. Prepare to slow or move over for worker safety. Last Updated 4/14/2026 6:45 PM #### I-5: SB MP 103 I-5, 5 miles North of Canyonville ##### Maintenance Work ##### Closure ##### Off Ramp Comments Road maintenance operations are occurring. Use an alternate route. Ramps Affected. Last Updated 4/14/2026 6:33 PM #### I-5: MP 119.3 to 119.7 I-5, Intersection with Coos Bay - Roseburg Highway ORE42 ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 4/26/2026 12:00:00 AM Details Alert: I-5 SB Exit 119 on/off-ramps to/from OR42 (Winston) Effective April 26, 2026, the I-5 southbound Exit 119 on/off ramps to/from OR42 will be intermittently closed Sunday through Thursday nights between the hours of 6:00 PM and 6:00 AM. The estimated completion date for this work is May 13, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: MP 119.7 to 119.9 I-5, 5 miles South of Roseburg ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 4/26/2026 12:00:00 AM Details Alert: I-5 NB Exit 119 on/off-ramps to/from OR42 (Winston) Effective April 26, 2026, the I-5 northbound Exit 119 on/off ramps to/from OR42 will be intermittently closed Sunday through Thursday nights between the hours of 6:00 PM and 6:00 AM. The estimated completion date for this work is May 13, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: MP 235.73 I-5, 2 miles North of Albany ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 5/4/2026 12:00:00 AM Details Alert: Century Dr/I-5 Frontage Rd NB & SB 235.73 (Murder Creek Bridge - Millersburg) Effective May 4, 2026, this section of Century Drive/I-5 Frontage Road northbound and southbound will be restricted to 12 feet 00 inches in width Monday through Thursday between the hours of 7:00 AM and 4:30 PM. The estimated completion date for this work is May 21, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: NB MP 248.35 I-5, 6 miles South of Intersection with ORE22, in Salem ##### Construction Work ##### Future Event: No to Minimum Delay Expected Start Date 4/14/2026 9:00:00 PM Lanes Affected (Northbound) 1 Lane Comments Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Last Updated 4/09/2026 6:02 PM #### I-5: NB MP 248.42 to 248.73 I-5, 6 miles South of Intersection with ORE22, in Salem ##### Construction Work ##### Informational only ##### On Ramp Comments Road construction is or will be occurring. Use caution. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. Southbound I-5 traffic to be shifted onto the former northbound lanes. Northbound I-5 traffic to use Exit 249 and the former I-5 on-ramp as the new northbound lanes. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929) Last Updated 3/30/2026 6:19 PM #### I-5: NB MP 248.65 to 249.73 I-5, 5 miles South of Intersection with ORE22, in Salem ##### Construction Work ##### Informational only ##### Off Ramp Comments Road construction is or will be occurring. Use caution. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. Southbound I-5 traffic to be shifted onto the former northbound lanes. Northbound I-5 traffic to use Exit 249 and the former I-5 on-ramp as the new northbound lanes. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929) Last Updated 3/30/2026 6:19 PM #### I-5: NB MP 248.69 I-5, 5 miles South of Intersection with ORE22, in Salem ##### Construction Work ##### No to Minimum Delay Comments Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929) Last Updated 3/30/2026 6:19 PM #### I-5: NB MP 249.08 to 249.85 I-5, 5 miles South of Intersection with ORE22, in Salem ##### Construction Work ##### Informational only ##### On Ramp Comments Road construction is or will be occurring. Use caution. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. Southbound I-5 traffic to be shifted onto the former northbound lanes. Northbound I-5 traffic to use Exit 249 and the former I-5 on-ramp as the new northbound lanes. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929) Last Updated 2/12/2026 4:28 PM #### I-5: MP 251.79 to 248.15 I-5, 2 miles South of Intersection with ORE22, in Salem ##### Commercial Vehicle Information ##### Informational only Details Alert: I-5 NB & SB MP 248.00 to MP 252.00 (Salem) Effective August 29, 2024, this section of I-5 northbound and southbound will be intermittently restricted to 16 feet 00 inches in width Sunday through Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this work is February 28, 2027. Last Updated 4/14/2026 4:00 PM #### I-5: NB MP 277.39 to 279.45 I-5, 5 miles North of Woodburn ##### Construction Work ##### Estimated delay under 20 minutes Comments Road construction is occurring. Prepare to slow. Watch for workers. Crews working daily, Sunday through Thursday with occasional night and weekend work. Up to two lanes closed nightly in either direction on I-5 from 8 p.m. to 8 a.m. Other roads in the project area to have single lane closures as needed from 9 p.m. to 6 a.m. Reduced speed to 55 mph in the work zone. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22505) Last Updated 4/10/2026 4:12 AM #### I-5: SB MP 297 to 300 I-5, Portland, Intersection with SW Terwilliger Blvd ##### Construction Work ##### Estimated delay under 20 minutes Comments No traffic impacts. ODOT is installing RealTime Variable Advisory Speed (VAS) signs along a busy stretch of Interstate 5 through south Portland from the Ross Island Bridge to Terwilliger Boulevard. Realtime VAS signs give drivers notice to slow down before they reach a problem area — improving traffic flow and helping to reduce rear-end crashes and congestion. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21602) Last Updated 4/03/2026 3:49 PM #### I-5: MP 301.35 to 300.89 I-5, Interstate 84 ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 4/27/2026 12:00:00 AM Details Alert: I-5 SB MP 301.06 (Portland) Effective April 27, 2026, this section of I-5 southbound will be restricted to 14 feet 11 inches in height Sunday through Thursday nights between 10 PM & 5 AM, and Friday through Saturday nights between 10 PM & 6 AM. The estimated completion date for this work is May 18, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: MP 301.35 to 300.89 I-5, Interstate 84 ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 4/27/2026 12:00:00 AM Details Alert: I-5 SB MP 301.35 to MP 300.89 (Portland) Effective April 27, 2026, this section of I-5 southbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between 10 PM & 5 AM, and Friday through Saturday nights between 10 PM & 6 AM. The estimated completion date for this work is May 18, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: MP 301.5 to 302.7 I-5, 1 mile South of I-405 North Interchange ##### Commercial Vehicle Information ##### Informational only Details Alert: I-5 SB MP 302.70 to MP 301.50 (Portland) Effective January 30, 2026, this section of I-5 southbound will be restricted to 14 feet 00 inches in Sunday night thru Friday night between the hours of 10 PM and 5 AM and Saturday night between the hours of 10:PM and 8:AM. Loads wider than 14 feet 00 inches may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is May 9, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: MP 301.58 I-5, I-405 North Interchange ##### Commercial Vehicle Information ##### Informational only Details Alert: I-5 SB MP 301.58 (Portland) Effective March 11, 2026, this section of I-5 southbound will be restricted to 14 feet 7 inches in height Sunday through Thursday nights between the hours of 10 PM and 5 AM. Loads over 14 feet 7 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is April 30, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: MP 301.59 to 301.96 I-5, I-405 North Interchange ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 4/20/2026 12:00:00 AM Details Alert: I-5 NB MP 301.59 to MP 301.96 (Portland) Effective April 20, 2026, this section of I-5 northbound will be restricted to 14 feet 00 inches in width Monday through Friday nights between the hours of 10 PM and 5 AM. Loads wider than 14 feet 00 inches may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is May 8, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: MP 301.6 to 302.8 I-5, I-405 North Interchange ##### Commercial Vehicle Information ##### Informational only Details Alert: I-5 SB MP 302.33 (Portland) Effective January 30, 2026, this section of I-5 southbound will be restricted to 16 feet 2 inches in height Sunday through Thursday nights between the hours of 10 PM and 5 AM. Loads over 16 feet 2 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is April 30, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: SB MP 301.85 to 301.72 I-5, I-405 North Interchange ##### Construction Work ##### No to Minimum Delay Comments Intermittent nighttime lane closures on I-5 SB from the Convention Center to Burnside from 9 p.m. to 6 a.m. weather permitting. No detours required. We are improving safety and congestion where I-5, I-84 and I-405 converge and reconnecting the Albina neighborhood by constructing a highway cover over a portion of I-5. From summer 2025 through late 2026, we are constructing new stormwater facilities, repairing the concrete deck in a section of I-5 completing a seismic retrofit, extending an existing merging lane on SB I-5, and constructing a new sign structure. \<!--Links Start Here--\> \[Link to Additional Information\](https://i5rosequarter.org/current-construction-travel-impacts/) Last Updated 4/03/2026 4:28 PM #### I-5: MP 302.4 to 302 I-5, I-405 North Interchange ##### Commercial Vehicle Information ##### Informational only Details Alert: I-5 NB MP 302.4 to MP 302.6 (Portland) Effective April 12, 2026, this section of I-5 northbound will be restricted to 12 feet 00 inches in width at night between the hours of 10 PM & 5 AM. Loads wider than 12 feet 00 inches may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is April 16, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: MP 302.4 I-5, I-405 North Interchange ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 4/22/2026 12:00:00 AM Details Alert: I-5 NB on-ramp from NE Broadway (Portland) Effective April 22, 2026, the I-5 northbound on-ramp from NE Broadway will be restricted to 12 feet 00 inches in width at night between the hours of 10 PM & 5 AM. Loads wider than 12 feet 00 inches may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is April 26, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: MP 303.37 to 302.28 I-5, 1 mile South of Portland, Intersection with Going St ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 4/16/2026 12:00:00 AM Details Alert: I-5 SB MP 303.161 (Portland) Effective April 16, 2026, this section of I-5 southbound will be restricted to 15 feet 5 inches in height at night between the hours 10 PM & 5 AM. Loads wider than 12 feet 00 inches may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is April 22, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: MP 303.37 to 302.28 I-5, 1 mile South of Portland, Intersection with Going St ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 4/16/2026 12:00:00 AM Details Alert: I-5 SB MP 303.37 to MP 302.28 (Portland) Effective April 16, 2026, this section of I-5 southbound will be restricted to 12 feet 00 inches in width at night between the hours 10 PM & 5 AM. Loads wider than 12 feet 00 inches may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is April 22, 2026. Last Updated 4/14/2026 4:00 PM ### [I-84]() #### I-84: WB MP 0 to 16 I-84, Interstate 5 ##### Construction Work ##### No to Minimum Delay Comments Daytime shoulder closures. Project Description: We’re improving safety and visibility at multiple I-84 interchange ramps between downtown Portland and Hood River by installing new lights, upgrading traffic signal heads, trimming overgrown vegetation and upgrading existing signs through fall 2026. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx) Last Updated 4/10/2026 3:19 PM #### I-84: EB MP 0 to 16 I-84, Interstate 5 ##### Construction Work ##### No to Minimum Delay Comments Daytime shoulder closures. Project Description: We’re improving safety and visibility at multiple I-84 interchange ramps between downtown Portland and Hood River by installing new lights, upgrading traffic signal heads, trimming overgrown vegetation and upgrading existing signs through fall 2026. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx) Last Updated 4/10/2026 3:31 PM #### I-84: MP 0 to 0.2 I-84, Interstate 5 ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 4/24/2026 12:00:00 AM Details Alert: I-84 WB Exit 1 off-ramp to Lloyd Center (Portland) Effective April 24, 2026, the I-84 westbound Exit 1 off-ramp to Lloyd Center will be closed at all hours. The estimated completion date for this work is May 4, 2026. Last Updated 4/14/2026 4:00 PM #### I-84: MP 13.03 to 77 ##### Snow Zone ##### Informational only Affected Area NE 181st in Troutdale east to just west of the Rowena Exit Minimum Chain Restriction Carry chains or traction tires regardless of conditions. [View more information on Chain Laws.](https://www.tripcheck.com/Pages/Chain-Law) #### I-84: WB MP 18 I-84, 1 mile East of Troutdale ##### Construction Work ##### No to Minimum Delay Comments Daytime periodic lane closures on Jordan Road, with flaggers directing traffic. We're building a new multi-use path parallel to Jordan Road (near I-84 at Exit 18) from the pedestrian tunnel under I-84 to the Sandy River Delta, increasing safer connections for people who walk, bike or roll. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/Regions/Pages/ColumbiaGorgeProjects.aspx) Last Updated 4/10/2026 3:21 PM #### I-84: MP 35.58 to 39 I-84, 5 miles East of Multnomah Falls ##### Commercial Vehicle Information ##### Informational only Details Alert: I-84 WB MP 35 to MP 39 (Warrendale) Effective March 1, 2026, this section of I-84 westbound will be restricted to 16 feet 00 inches in width at all hours. The estimated completion date for this work is July 1, 2026. Last Updated 4/14/2026 4:00 PM #### I-84: MP 36 to 39 I-84, 5 miles East of Multnomah Falls ##### Commercial Vehicle Information ##### Informational only Details Alert: I-84 EB MP 36 to MP 39 (Warrendale) Effective March 1, 2026, this section of I-84 eastbound will be restricted to 17 feet 00 inches in width at all hours. The estimated completion date for this work is July 1, 2026. Last Updated 4/14/2026 4:00 PM #### I-84: EB MP 37 to 38 I-84, 6 miles East of Multnomah Falls ##### Maintenance Work ##### Estimated delay under 20 minutes Lanes Affected (Eastbound) Median , 1 Lane Comments Road work has the EB left lane closed at mile post 37. The onramp from Warrendale to EB is closed. Prepare to slow or move over for worker safety. Ramps Affected. Last Updated 3/01/2026 2:11 PM #### I-84: MP 37 to 37.6 I-84, 6 miles East of Multnomah Falls ##### Commercial Vehicle Information ##### Informational only Details Alert: I-84 EB on-ramp from NE Frontage Rd/Hwy 100 (Warrendale) Effective March 1, 2026, the I-84 eastbound on-ramp from NE Frontage Road/Highway 100 will be closed at all hours. The estimated completion date for this work is July 7, 2026. Last Updated 4/14/2026 4:00 PM #### I-84: EB MP 37.3 to 38.4 I-84, 6 miles East of Multnomah Falls ##### Construction Work ##### Estimated delay under 20 minutes Comments Road construction is occurring. Prepare to slow. Watch for workers. We are preparing to replace the aging bridge that carries I-84 east over McCord Creek near Warrendale in 2025-2026. Replacing the bridge will eliminate a dip in the roadway and increase safety, earthquake resilience, and the lifespan of the highway. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21766) Last Updated 4/10/2026 11:43 AM #### I-84: WB MP 38.5 to 37.5 I-84, 7 miles West of Cascade Locks ##### Maintenance Work ##### Estimated delay under 20 minutes Lanes Affected (Westbound) Median , 1 Lane Comments Road work has the WB left lane closed at mile post 38.5. Prepare to slow or move over for worker safety. Last Updated 3/01/2026 12:56 PM #### I-84: EB MP 69 I-84, 5 miles East of Hood River ##### Crash/Hazard ##### No to Minimum Delay Comments A crash has occurred with minimal delay to traffic. Prepare to slow or move over for worker safety. Last Updated 4/14/2026 2:58 PM #### I-84: EB MP 87 to 138.9 I-84, The Dalles ##### Construction Work ##### Estimated delay under 20 minutes Lanes Affected (Westbound) 2 Lanes (Eastbound) 2 Lanes Comments Road construction is occurring. Prepare to slow. Watch for workers. Crews may be onsite as weather permits for striping and work with the median barrier. Expect possible single lane closures with temporary crossover traffic in both eastbound and westbound lanes with speed reductions. Use caution. Last Updated 3/13/2026 7:07 PM #### I-84: MP 108 to 109.78 I-84, 3 miles East of Biggs Junction ##### Commercial Vehicle Information ##### Informational only Details Alert: I-84 EB & WB MP 107.90 to MP 109.90 (Rufus) Effective January 5, 2026 this section of I-84 eastbound and westbound will be restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. The estimated completion date for this work is May 15, 2026. Last Updated 4/14/2026 4:00 PM #### I-84: MP 137.6 to 138.1 I-84, Arlington ##### Commercial Vehicle Information ##### Informational only Details Alert: I-84 EB & WB MP 137.60 to MP 138.10 (Arlington) Effective January 5, 2026 this section of I-84 eastbound and westbound will be restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. The estimated completion date for this work is May 15, 2026. Last Updated 4/14/2026 4:00 PM #### I-84: EB MP 159.3 I-84, 5 miles West of Boardman ##### Construction Work ##### Estimated delay under 20 minutes Lanes Affected (Westbound) 2 Lanes (Eastbound) 2 Lanes Comments Road construction is occurring. Prepare to slow. Watch for workers. Expect intermittent lane closures throughout the work zone. Use caution, prepare to slow. Last Updated 4/13/2026 1:32 AM #### I-84: MP 159.3 I-84, 5 miles West of Boardman ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 5/11/2026 12:00:00 AM Details Alert: I-84 EB Exit 159 off-ramp to Tower Rd NB (Boardman) Effective May 11, 2026, the I-84 EB Exit 159 off-ramp to Tower Road northbound will be closed at all hours. The estimated completion date for this work is May 18, 2026. Last Updated 4/14/2026 4:00 PM #### I-84: MP 159.3 I-84, 5 miles West of Boardman ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 5/11/2026 12:00:00 AM Details Alert: I-84 WB Exit 159 off-ramp to Tower Rd SB (Boardman) Effective May 11, 2026, the I-84 westbound Exit 159 off-ramp to Tower Road southbound will be restricted to 14 feet 00 inches in width at all hours. The estimated completion date for this work is May 18, 2026. Last Updated 4/14/2026 4:00 PM #### I-84: MP 159.3 I-84, 5 miles West of Boardman ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 5/26/2026 12:00:00 AM Details Alert: I-84 WB Exit 159 off-ramp to Tower Rd SB (Boardman) Effective May 26, 2026, the I-84 westbound Exit 159 off-ramp to Tower Road southbound will be closed at all hours. The estimated completion date for this work is June 2, 2026. Last Updated 4/14/2026 4:00 PM #### I-84: MP 159.3 I-84, 5 miles West of Boardman ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 5/26/2026 12:00:00 AM Details Alert: I-84 EB Exit 159 off-ramp to Tower Rd NB (Boardman) Effective May 26, 2026, the I-84 eastbound Exit 159 off-ramp to Tower Road northbound will be restricted to 14 feet 00 inches in width at all hours. The estimated completion date for this work is June 2, 2026. Last Updated 4/14/2026 4:00 PM #### I-84: MP 159.5 I-84, 5 miles West of Boardman ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 6/3/2026 12:00:00 AM Details Alert: I-84 WB Exit 159 off-ramp to Tower Rd SB & I-84 EB Exit159 off-ramp to Tower Rd NB (Boardman) Effective June 3, 2026, the I-84 westbound Exit 159 off-ramp to Tower Road southbound and the I-84 eastbound Exit 159 off-ramp to Tower Road northbound will be closed at all hours. The estimated completion date for this work is July 2, 2026. Last Updated 4/14/2026 4:00 PM #### I-84: MP 216 to 261 ##### Snow Zone ##### Informational only Affected Area (Pendleton to La Grande) Cabbage Hill/Deadman Pass (Elev.3615') - Summit Blue Mountains (Elev. 4193') Minimum Chain Restriction Carry chains or traction tires regardless of conditions. [View more information on Chain Laws.](https://www.tripcheck.com/Pages/Chain-Law) #### I-84: MP 249 to 260 I-84, 10 miles West of La Grande ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 4/27/2026 12:00:00 AM Details Alert: I-84 EB MP 249 to MP 260 (La Grande) Effective April 27, 2026, this section of I-84 eastbound will be restricted to 16 feet 00 inches in width Monday through Thursday between the hours of 6:00 AM & 5:00 PM. The estimated completion date for this work is April 30, 2026. Last Updated 4/14/2026 4:00 PM #### I-84: MP 249 to 260 I-84, 10 miles West of La Grande ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 4/27/2026 12:00:00 AM Details Alert: I-84 EB MP 249 to MP 260 (La Grande) Effective April 27, 2026, this section of I-84 eastbound will be restricted to 195 feet 00 inches in length Monday through Thursday between the hours of 6:00 AM & 5:00 PM. The estimated completion date for this work is April 30, 2026. Last Updated 4/14/2026 4:00 PM #### I-84: MP 249 to 260 I-84, 10 miles West of La Grande ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 4/20/2026 12:00:00 AM Details Alert: I-84 WB MP 249 to MP 260 (La Grande) Effective April 20, 2026, this section of I-84 westbound will be restricted to 195 feet 00 inches in length Monday through Thursday between the hours of 6:00 AM & 5:00 PM. The estimated completion date for this work is April 23, 2026. Last Updated 4/14/2026 4:00 PM #### I-84: MP 249 to 260 I-84, 10 miles West of La Grande ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 4/20/2026 12:00:00 AM Details Alert: I-84 WB MP 249 to MP 260 (La Grande) Effective April 20, 2026, this section of I-84 westbound will be restricted to 16 feet 00 inches in width Monday through Thursday between the hours of 6:00 AM & 5:00 PM. The estimated completion date for this work is April 23, 2026. Last Updated 4/14/2026 4:00 PM #### I-84: MP 249 to 260 I-84, 10 miles West of La Grande ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 4/20/2026 12:00:00 AM Details Alert: I-84 WB MP 256.40 (La Grande) Effective April 20, 2026, this section of I-84 westbound will be restricted to 16 feet 9 inches in height Monday through Thursday between the hours of 6:00 AM & 5:00 PM. The estimated completion date for this work is April 23, 2026. Last Updated 4/14/2026 4:00 PM #### I-84: MP 266 to 280 ##### Snow Zone ##### Informational only Affected Area Ladd Canyon - La Grande to North Powder Minimum Chain Restriction Carry chains or traction tires regardless of conditions. [View more information on Chain Laws.](https://www.tripcheck.com/Pages/Chain-Law) #### I-84: MP 300 to 328 ##### Snow Zone ##### Informational only Affected Area Pleasant Valley - Baker City to Durkee Minimum Chain Restriction Carry chains or traction tires regardless of conditions. [View more information on Chain Laws.](https://www.tripcheck.com/Pages/Chain-Law) #### I-84: MP 328 to 352 ##### Snow Zone ##### Informational only Affected Area Durkee Interchange (Elev. 2700') to Farewell Bend (Elev. 2200') Minimum Chain Restriction Carry chains or traction tires regardless of conditions. [View more information on Chain Laws.](https://www.tripcheck.com/Pages/Chain-Law) #### I-84: MP 335.76 to 376 I-84, 10 miles West of Huntington ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 6/1/2026 12:00:00 AM Details Alert: I-84 EB and WB MP 335.76 to MP 376.00 (Weatherby to Ontario) Effective June 1, 2026, this section of I-84 eastbound and westbound will be restricted to 16 feet 00 inches in width Monday through Thursday between the hours of 6 AM & 6 PM. Loads over 16 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for more information. The estimated completion date for this work is June 30, 2026. Last Updated 4/14/2026 4:00 PM #### I-84: MP 351 to 356 I-84, 5 miles East of Huntington ##### Commercial Vehicle Information ##### Informational only Details Alert: I-84 EB & WB MP 351.0 to 356.0 (Huntington) Effective March 20, 2026, this section of I-84 eastbound and westbound will be restricted to 16 feet 00 inches in width at all hours. The estimated completion date for this work is October 31, 2026. Last Updated 4/14/2026 4:00 PM #### I-84: MP 351 to 356 I-84, 5 miles East of Huntington ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 5/4/2026 12:00:00 AM Details Alert: I-84 WB Exit 356 on-ramp from OR201 (Huntington) Effective May 4, 2026, the I-84 westbound Exit 356 on-ramp from OR201 will be closed at all hours. The estimated completion date for this work will be July 03, 2026. Last Updated 4/14/2026 4:00 PM #### I-84: EB MP 352.05 to 368.16 I-84, Baker - Malheur County Line ##### Construction Work ##### Estimated delay under 20 minutes Lanes Affected (Westbound) Median , 2 Lanes , Shoulder (Eastbound) Median , 2 Lanes , Shoulder Comments Road construction is occurring. Prepare to slow. Watch for workers. Ramps Affected. Crews will be onsite continuing work. All traffic has transitioned to the eastbound side of the freeway. Follow traffic signs, be prepared to slow and use caution while passing through workzone(s). Last Updated 4/13/2026 2:33 AM #### I-84: MP 353 I-84, 7 miles East of Huntington ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 5/1/2026 12:00:00 AM Details Alert: I-84 WB Exit 353 on-ramp from US30 (Huntington) Effective May 1, 2026, the I-84 westbound Exit 353 on-ramp from US30 will be closed at all hours. The estimated completion date for this work is May 3, 2026. Last Updated 4/14/2026 4:00 PM #### I-84: MP 353 I-84, 7 miles East of Huntington ##### Commercial Vehicle Information ##### Informational only Details Alert: I-84 EB Exit 353 off-ramp to US30 (Huntington) Effective April 13, 2026, the I-84 eastbound Exit 353 off-ramp to US30 will be closed at all hours. The estimated completion date for this work is April 18, 2026. Last Updated 4/14/2026 4:00 PM #### I-84: MP 353 I-84, 7 miles East of Huntington ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 5/1/2026 12:00:00 AM Details Alert: I-84 EB Exit 353 on-ramp from US30 (Huntington) Effective May 1, 2026, the I-84 eastbound Exit 353 on-ramp from US30 will be closed at all hours. The estimated completion date for this work is May 2, 2026. Last Updated 4/14/2026 4:00 PM ### [US101]() #### US101: MP 4.91 US101, Astoria ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 4/27/2026 12:00:00 AM Details Alert: US101 NB & SB MP 4.91 New Young's Bay Bridge (Astoria) Effective April 27, 2026, this section of US101 northbound and southbound will be closed at night between the hours of 8:00 PM & 6:00 AM. The estimated completion date for this work is April 28, 2026. Last Updated 4/14/2026 4:00 PM #### US101: MP 28.8 to 31.27 US101, Cannon Beach ##### Construction Work ##### No to Minimum Delay Comments Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Last Updated 2/28/2026 1:24 PM #### US101: NB MP 66.15 to 66.18 US101, Intersection with Wilson River Highway ORE6 ##### Maintenance Work ##### Future Event: No to Minimum Delay Expected Start Date 4/20/2026 8:00:00 AM Lanes Affected (Northbound) 2 Lanes (Southbound) 2 Lanes Comments Utility work is causing minimal delay to traffic. Use caution. Last Updated 4/14/2026 11:20 AM #### US101: MP 102 to 103 US101, 5 miles South of Neskowin ##### Information ##### Estimated delay of 20 minutes - 2 hours Lanes Affected (Northbound) 2 Lanes Comments Expect delays due to highway erosion. Prepare to slow. Northbound lanes are closed. Traffic is being flagged through the area. Use caution and expect delays. Last Updated 4/11/2026 10:34 PM #### US101: MP 112.35 to 121.44 US101, Lincoln City ##### Construction Work ##### Estimated delay under 20 minutes Lanes Affected (Northbound) 1 Lane (Southbound) 1 Lane Comments Road construction is occurring. Prepare to slow. Watch for workers. Expect nighttime lane closures and delays for ADA curb ramp construction. No lane closures will occur over the weekend. Some night work may occur as needed. From N 34th Street to SW 51st Street / SE 51st Street. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22434) Last Updated 4/11/2026 10:14 AM #### US101: MP 121 to 124.94 US101, 3 miles North of Lincoln Beach ##### Construction Work ##### No to Minimum Delay Lanes Affected (Northbound) 1 Lane (Southbound) 1 Lane Comments Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Expect lane closures and delays for ADA curb ramp construction. Only 1 lane will be closed at a time from Salishan Hills Drive to North Fogarty Creek State Park (Road) \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22434) Last Updated 3/30/2026 6:22 PM #### US101: MP 127.61 US101, Depoe Bay ##### Construction Work ##### No to Minimum Delay Comments Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Work beginning on bridge rehabilitation. Expect periodic lane closures Monday through Thursday. Most lane closures will occur during nighttime hours, with a few exceptions that will happen during the day between the hours of 7AM and 5PM \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20110) Last Updated 4/03/2026 11:55 AM #### US101: MP 134 US101, 7 miles North of Newport ##### Crash/Hazard ##### No to Minimum Delay Comments Sunken pavement is causing minimal delay to traffic. Use caution. Last Updated 4/12/2026 11:58 AM #### US101: MP 136 US101, 5 miles North of Newport ##### Crash/Hazard ##### No to Minimum Delay Comments Sunken pavement is causing minimal delay to traffic. Use caution. Last Updated 4/10/2026 9:53 PM #### US101: MP 141.37 to 141.98 US101, Newport ##### Weather Impact ##### Informational only Comments Winds have prompted ODOT to warn drivers that Yaquina Bay Bridge may close to high profile vehicles MP141. High profile vehicles are vehicles with large, flat vertical surfaces exposed to the wind. Examples include large commercial box vans, box trailers, trailer-mounted cargo containers, mobile homes, school buses, motor homes, and travel trailers. Vehicles and trailers with visible cargo such as flatbed trucks, stake and platform trailers and log trucks are not considered high-profile vehicles. Last Updated 3/24/2026 10:53 AM #### US101: NB MP 236 to 236.5 US101, North Bend ##### Construction Work ##### No to Minimum Delay Lanes Affected (Northbound) 1 Lane Comments Lane closure causing minimal delay to traffic. Use caution. Last Updated 1/17/2026 1:13 PM #### US101: MP 288 to 287 US101, Langlois ##### Maintenance Work ##### Estimated delay under 20 minutes Lanes Affected (Northbound) 1 Lane (Southbound) 1 Lane Comments Road maintenance operations are occurring. Prepare to slow or move over for worker safety. Last Updated 4/14/2026 8:26 AM #### US101: MP 300 to 330 US101, Port Orford ##### Weather Impact ##### Informational only Comments High wind warning. Use caution. High profile vehicles are vehicles with large, flat vertical surfaces exposed to the wind. Examples include large commercial box vans, box trailers, trailer-mounted cargo containers, mobile homes, school buses, motor homes, and travel trailers. Vehicles and trailers with visible cargo such as flatbed trucks, stake and platform trailers and log trucks are not considered high-profile vehicles. Last Updated 4/01/2026 12:49 PM #### US101: MP 300 to 330 US101, Port Orford ##### Weather Impact ##### Informational only Comments High wind warning. Use caution. High profile vehicles are vehicles with large, flat vertical surfaces exposed to the wind. Examples include large commercial box vans, box trailers, trailer-mounted cargo containers, mobile homes, school buses, motor homes, and travel trailers. Vehicles and trailers with visible cargo such as flatbed trucks, stake and platform trailers and log trucks are not considered high-profile vehicles. Last Updated 4/01/2026 7:21 PM #### US101: MP 312 US101, 12 miles South of Port Orford ##### Construction Work ##### No to Minimum Delay Comments Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Last Updated 4/02/2026 4:18 PM #### US101: MP 327.4 to 329.5 US101, Wedderburn ##### Construction Work ##### Estimated delay under 20 minutes Comments Road construction is occurring. Prepare to slow. Watch for workers. Last Updated 4/02/2026 4:18 PM #### US101: MP 354.8 to 359.3 US101, Brookings ##### Construction Work ##### Estimated delay under 20 minutes Comments Road construction is occurring. Prepare to slow. Watch for workers. Last Updated 4/02/2026 4:19 PM ### [US101B]() #### US101B: MP 4.78 US101B, 2 miles West of Astoria ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 4/28/2026 12:00:00 AM Details Alert: US101 Bus EB & WB MP 4.78 Lewis & Clark River Bridge (Astoria) Effective April 28, 2026, this section of US101 Business eastbound and westbound will be closed, Tuesday night through Wednesday morning between the hours of 7:00 PM and 6:00 AM. The estimated completion date for this work is April 29, 2026. Last Updated 4/14/2026 4:00 PM #### US101B: MP 6.89 US101B, Astoria ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 4/29/2026 12:00:00 AM Details Alert: US101 Bus EB & WB MP 6.89 the Old Youngs Bay Bridge (Astoria) Effective April 29, 2026, this section of US101 Business eastbound and westbound will be closed, Wednesday and Thursday nights between the hours of 7:00 PM and 6:00 AM. The estimated completion date for this work is May 1, 2026. Last Updated 4/14/2026 4:00 PM ### [US197]() #### US197: MP 28.5 to 32 US197, 6 miles North of Tygh Valley ##### Crash/Hazard ##### No to Minimum Delay Lanes Affected (Northbound) , Shoulder (Southbound) , Shoulder Comments A rock fall has occurred causing minimal delay to traffic. Use caution. Last Updated 4/08/2026 8:50 PM ### [US199]() #### US199: NB MP 2.15 US199, Grants Pass ##### Crash/Hazard ##### No to Minimum Delay Comments Sunken pavement on pathway is causing minimal delay to traffic. Pedestrians and bicyclists use caution. Last Updated 2/06/2026 12:45 PM #### US199: MP 30 US199, 1 mile South of Cave Junction ##### Information ##### No to Minimum Delay Comments Burning is taking place along the highway causing no to minimum delays. Use caution. Last Updated 4/14/2026 11:32 AM ### [US20]() #### US20: MP 1.82 to 2.8 US20, N.E. Purcell Blvd. (Bend) ##### Construction Work ##### Estimated delay under 20 minutes Lanes Affected (Westbound) 1 Lane (Eastbound) 1 Lane Comments Road construction is occurring. Prepare to slow. Watch for workers. Expect single lane closures during both day and night shifts, controlled with flaggers. Expect delays. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22442) Last Updated 4/13/2026 12:15 AM #### US20: NB MP 84 to 84.06 ORE99W, Intersection with Corvallis - Newport Highway US20 ##### Construction Work ##### Estimated delay under 20 minutes Comments Road construction is occurring. Prepare to slow. Watch for workers. You can expect crews working during the day with lane and shoulder closures as needed. Please drive with caution and watch for workers. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-corvallis) Last Updated 3/30/2026 6:21 PM #### US20: MP 88.2 to 91.75 ##### Snow Zone ##### Informational only Affected Area Sisters - Jack Lake Rd to just west of Black Butte Ranch Minimum Chain Restriction Carry chains or traction tires regardless of conditions. [View more information on Chain Laws.](https://www.tripcheck.com/Pages/Chain-Law) #### US20: MP 92.29 to 92.7 ORE126, Sisters ##### Construction Work ##### Estimated delay under 20 minutes Lanes Affected (Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder Comments Road construction is occurring. Prepare to slow. Watch for workers. Expect nightly single lane closures with flaggers throughout work zone Monday - Thursday, pm to 7am. Use caution, prepare to stop. Last Updated 4/13/2026 12:33 AM #### US20: MP 99.75 to 99.99 US20, Sisters ##### Commercial Vehicle Information ##### Informational only Details Alert: US20 EB & WB MP 99.75 to MP 99.99 (Sisters) Effective October 1, 2025, this section of US20 eastbound and westbound will be restricted to 10 feet 00 inches in width Sunday through Thursday nights between the hours of 8 PM & 7 AM. Loads over 10 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is May 22, 2026. Last Updated 4/14/2026 4:00 PM #### US20: MP 99.75 to 99.99 US20, Sisters ##### Commercial Vehicle Information ##### Informational only Details Alert: US20 EB & WB MP 99.75 to MP 99.99 (Sisters) Effective October 1, 2025, this section of US20 eastbound and westbound will be restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is May 22, 2026. Last Updated 4/14/2026 4:00 PM #### US20: MP 154.2 to 166.6 ##### Snow Zone ##### Informational only Affected Area Stinkingwater Pass (Elev. 4848') - Just west of Buchanan to just west of Stinkingwater Creek Rd. Minimum Chain Restriction Carry chains or traction tires regardless of conditions. [View more information on Chain Laws.](https://www.tripcheck.com/Pages/Chain-Law) #### US20: MP 200 US20, 10 miles East of Juntura ##### Crash/Hazard ##### No to Minimum Delay Comments A crash has occurred with minimal delay to traffic. Prepare to slow or move over for worker safety. Last Updated 4/14/2026 5:46 PM ### [US26]() #### US26: MP 5.85 to 9.96 US26, Portland ##### Construction Work ##### Informational only Comments Lane closures, traffic shifts, shoulder closures and up to 20-minute traffic holds 8:00 a.m. to 5:00 p.m., weekdays. Temporary sidewalk closures with accessible pedestrian detours. Possible nighttime work with closures. Travelers can expect congestion during construction. Alternate routes are available. Flaggers may be directing traffic. Project Description: We are constructing safety improvements to help people travel Outer SE Powell Boulevard more safely from SE 99th Avenue to SE 122nd Avenue and SE 136th Avenue to just east of SE 174th Avenue (the Portland/Gresham city limits). The first phase, from SE 122nd Avenue to SE 136th Avenue, is complete. The overall Outer Powell Project will add a center turn lane, sidewalks and bike lanes. These improvements reduce the frequency and severity of crashes as well as help people driving, taking transit, walking and biking share the road with fewer conflicts. Pre-construction activities are underway. Road construction began spring 2025 and is anticipated to last five years. Last Updated 4/03/2026 7:39 PM #### US26: MP 5.87 to 7.9 US26, Portland ##### Commercial Vehicle Information ##### Informational only Details Alert: US26 EB & WB MP 5.87 to MP 7.9 (Portland) Effective July 13, 2025, this section of US26 eastbound and westbound will be restricted to 10 feet 00 inches in width at night half an hour after sunset to half an hour before sunrise. Loads over 10 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is July 3, 2026. Last Updated 4/14/2026 4:00 PM #### US26: MP 7.9 to 9.96 US26, Portland ##### Commercial Vehicle Information ##### Informational only Details Alert: US26 Powell Blvd EB & WB 7.90 to MP 9.96 (Portland) Effective November 21, 2025, this section of US26 eastbound and westbound will be continuously restricted to 10 feet 00 inches in width from at all hours. Loads wider than 10 feet 00 inches may be accommodated on a case-by-case basis Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is November 2, 2026. Last Updated 4/14/2026 4:00 PM #### US26: MP 13 US26, 4 miles East of Necanicum ##### Crash/Hazard ##### Estimated delay under 20 minutes Lanes Affected (Westbound) 2 Lanes (Eastbound) 1 Lane Comments Sunken grade. Prepare to slow. Last Updated 4/07/2026 7:47 PM #### US26: MP 25.12 to 42.5 ##### Snow Zone ##### Informational only Affected Area Sandy to Zigzag Minimum Chain Restriction Carry chains or traction tires regardless of conditions. [View more information on Chain Laws.](https://www.tripcheck.com/Pages/Chain-Law) #### US26: MP 50 to 52 US26, 8 miles West of Intersection with Mount Hood Highway OR35 ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 5/11/2026 12:00:00 AM Details Alert: US26 EB and WB MP 50 to MP 52 (Government Camp) Effective May 11, 2026, this section of US26 eastbound and westbound will be restricted to 12 feet 00 inches in width and 100 feet 00 inches in length between the hours of 5 AM and 5 PM. The estimated completion date for this work is May 14, 2026. Last Updated 4/14/2026 4:00 PM #### US26: MP 52.9 to 57.3 ##### Snow Zone ##### Informational only Affected Area Ochoco Pass Summit WB (Elev. 4720') - Just west of the Ochoco National Forest Boundary to just west of Gage Creek Rd Minimum Chain Restriction Carry chains or traction tires regardless of conditions. [View more information on Chain Laws.](https://www.tripcheck.com/Pages/Chain-Law) #### US26: MP 59.57 to 75.5 ##### Snow Zone ##### Informational only Affected Area Blue Box Pass (Elev. 4025') & Warm Springs Jct - OR35 Jct to Warm Springs Jct Minimum Chain Restriction Carry chains or traction tires regardless of conditions. [View more information on Chain Laws.](https://www.tripcheck.com/Pages/Chain-Law) #### US26: MP 179.05 to 190.47 ##### Snow Zone ##### Informational only Affected Area Dixie Summit (Elev. 5277') - Just east of Dixie View Rd to just east of Davis Creek Rd Minimum Chain Restriction Carry chains or traction tires regardless of conditions. [View more information on Chain Laws.](https://www.tripcheck.com/Pages/Chain-Law) #### US26: MP 191.3 to 204.7 ##### Snow Zone ##### Informational only Affected Area Blue Mountain Pass Summit - Austin (Elev, 5109') Just east of Jct. US26 OR7 to just east of FS 12 Minimum Chain Restriction Carry chains or traction tires regardless of conditions. [View more information on Chain Laws.](https://www.tripcheck.com/Pages/Chain-Law) #### US26: MP 218.43 to 225.23 ##### Snow Zone ##### Informational only Affected Area Eldorado Summit (Elev. 4623') - Just east of Clear Creek Rd to east of the viewpoint Minimum Chain Restriction Carry chains or traction tires regardless of conditions. [View more information on Chain Laws.](https://www.tripcheck.com/Pages/Chain-Law) ### [US30]() #### US30: MP 1.65 to 2.02 US30, La Grande ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 4/25/2026 12:00:00 AM Details Alert: US30/Hwy 66 EB & WB MP 1.65 to MP 2.02 (La Grande) Effective Saturday, April 25, 2026, this section of US30/Hwy 66 eastbound and westbound will be closed from Fourth Street (mile point 1.65) to Greenwood Street (mile point 2.02) from 8:00 AM to 11:00 AM in the city of La Grande for the La Grande Little League opening day parade. The estimated completion date is April 25, 2026. Last Updated 4/14/2026 4:00 PM #### US30: WB MP 2.81 to 3.32 US30, Pendleton ##### Construction Work ##### No to Minimum Delay Lanes Affected (Westbound) , Shoulder (Eastbound) , Shoulder Comments Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Crews may be onsite to continue work on an ADA Curb Ramp project. Use caution, obey all signs while passing through the work zone. Last Updated 3/10/2026 11:14 AM #### US30: MP 43.9 to 44.1 US30, 4 miles South of Haines ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 4/27/2026 12:00:00 AM Details Alert: US30 EB & WB MP 43.90 to MP 44.10 (Baker Hwy - La Grande) Effective April 27, 2026, this section of US30 eastbound and westbound will be closed at all hours. The estimated completion date for this work is May 11, 2026. Last Updated 4/14/2026 4:00 PM #### US30: MP 43.93 to 44.06 US30, 4 miles South of Haines ##### Construction Work ##### Informational only Comments Road construction is or will be occurring. Use caution. Crews will be installing detour signs to begin preparation for closing Pole Line Lane. Use caution, follow detour. Last Updated 4/13/2026 1:30 AM #### US30: MP 66.52 to 69.4 US30, 6 miles West of The Dalles ##### Crash/Hazard ##### Conditional Closure Lanes Affected (Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder Comments The highway is open to local traffic and local deliveries only. No through traffic allowed. Last Updated 4/13/2026 7:03 AM ### [US30BY]() #### US30BY: MP 0.4 to 0.6 US30BP, Intersection with Lower Columbia River Highway US30 ##### Construction Work ##### No to Minimum Delay Comments No traffic impacts. Project Description: We are improving the long-term safety and lifespan of the St. Johns Bridge by repairing the concrete on the pier columns and arches under the bridge. Repairing the concrete will protect the bridge's steel internal frame and reinforcements from corrosion, maintaining the service life of this beloved Portland Historic Landmark. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=37899) Last Updated 4/10/2026 3:34 PM #### US30BY: MP 8.19 to 8.41 US30BP, 3 miles West of Intersection with East Portland Highway I-205 ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 5/1/2026 12:00:00 AM Details Alert: US30 Bypass EB & WB MP 8.19 to MP 8.41 (Portland) Effective May 1, 2026, this section of US30 Bypass eastbound and westbound will be closed all weekend starting at 10:00 PM on Friday to 5:00 AM on Monday. The estimated completion date for this work is May 4, 2026. Last Updated 4/14/2026 4:00 PM ### [US395]() #### US395: MP 4.33 to 6.03 US395, Hermiston ##### Construction Work ##### Estimated delay under 20 minutes Lanes Affected (Northbound) 2 Lanes , Shoulder (Southbound) 2 Lanes , Shoulder Comments Road construction is occurring. Prepare to slow. Watch for workers. Crews will be onsite conducting work along side the highway. Traffic control devices will be in place while work is being performed. Exercise caution and obey all traffic control signs while passing through the work zone(s). \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=23430) Last Updated 4/07/2026 1:17 AM #### US395: MP 33.6 to 42.5 ##### Snow Zone ##### Informational only Affected Area Battle Mountain Summit (Elev. 4270') - Webb Slough to Corral Creek Minimum Chain Restriction Carry chains or traction tires regardless of conditions. [View more information on Chain Laws.](https://www.tripcheck.com/Pages/Chain-Law) #### US395: MP 65 to 82.9 ##### Snow Zone ##### Informational only Affected Area Meadow Brook Summit (Elev. 4127') - Dale to Ritter Butte Summit (Elev. 3993') Minimum Chain Restriction Carry chains or traction tires regardless of conditions. [View more information on Chain Laws.](https://www.tripcheck.com/Pages/Chain-Law) #### US395: MP 73.2 US395, 16 miles North of Long Creek ##### Information ##### No to Minimum Delay Lanes Affected (Southbound) , Shoulder Comments Highway erosion is causing minimal delay to traffic. Use caution. Last Updated 4/13/2026 6:30 AM #### US395: MP 93 US395, 4 miles South of Long Creek ##### Information ##### Informational only ##### Rest Area Comments Carter rest area is closed for the season. Last Updated 4/11/2026 6:57 AM ### [US97]() #### US97: MP 18.88 to 27.4 US97, 1 mile South of Moro ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 5/31/2026 12:00:00 AM Details Alert: US97 NB & SB MP 18.88 to MP 27.4 (Moro & Grass Valley) Effective May 31, 2026, this section of US97 northbound and southbound will be restricted to 11 feet 00 inches in width Sunday through Thursday nights between the hours of 7 PM and 7 AM. Loads exceeding these dimensions may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is August 28, 2026. Last Updated 4/14/2026 4:00 PM #### US97: MP 73.4 to 67.7 ##### Snow Zone ##### Informational only Affected Area Cow Canyon NB - Just south of jct with ORE293 to just south of Shaniko Junction Minimum Chain Restriction Carry chains or traction tires regardless of conditions. [View more information on Chain Laws.](https://www.tripcheck.com/Pages/Chain-Law) #### US97: MP 114.56 to 116.56 US97, 1 mile North of Terrebonne ##### Construction Work ##### Estimated delay under 20 minutes Lanes Affected (Northbound) Median , 1 Lane , Shoulder (Southbound) Median , 1 Lane , Shoulder Comments Road construction is occurring. Prepare to slow. Watch for workers. Vehicles will only be able to turn right from southbound Lower Bridge Way to US97, and right from southbound US97 to Lower Bridge Way. Odem Ave intersection: vehicles will only be able to turn right from US97 to Odem Ave southbound and turning right from Odem Ave to US97 southbound. Follow signed detours, use caution. Last Updated 4/13/2026 12:07 AM #### US97: MP 114.75 to 116.41 US97, 1 mile North of Terrebonne ##### Commercial Vehicle Information ##### Informational only Details Alert: US97 NB & SB MP 114.75 to MP 116.41 (Terrebonne) Effective April 21, 2025, this section of US97 northbound and southbound will be restricted to 19 feet 00 inches in width at all hours. Loads exceeding these dimensions may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is April 15, 2026. Last Updated 4/14/2026 4:00 PM #### US97: MP 115.23 US97, 1 mile North of Terrebonne ##### Commercial Vehicle Information ##### Informational only Details Alert: US97 NB off-ramp to Lower Bridge Way (Terrebonne) Effective April 21, 2025, the US97 northbound off-ramp to Lower Bridge Way will be closed. The estimated completion date for this work is April 15, 2026. Last Updated 4/14/2026 4:00 PM #### US97: NB MP 122.88 to 122.9 US97, Intersection with McKenzie Highway ORE126 ##### Maintenance Work ##### No to Minimum Delay Comments Road maintenance operations are occurring causing minimal delay to traffic. Prepare to slow or move over for worker safety. Last Updated 4/14/2026 2:33 PM #### US97: NB MP 136.94 US97, Bend ##### Construction Work ##### Estimated delay under 20 minutes Comments Road construction is occurring. Prepare to slow. Watch for workers. Last Updated 3/02/2026 11:51 AM #### US97: SB MP 144 to 145 US97, 4 miles South of Bend ##### Maintenance Work ##### Estimated delay under 20 minutes Lanes Affected (Southbound) 1 Lane Comments Road maintenance operations are occurring. Prepare to slow or move over for worker safety. Last Updated 4/14/2026 7:37 PM #### US97: MP 146.1 to 155.5 ##### Snow Zone ##### Informational only Affected Area Lava Butte SB - South of Bend ODOT Weight Station to Lambertiana & Vandevert Rd Minimum Chain Restriction Carry chains or traction tires regardless of conditions. [View more information on Chain Laws.](https://www.tripcheck.com/Pages/Chain-Law) ### [ORE126]() #### ORE126: MP 0.22 to 13.5 ORE126, Redmond ##### Construction Work ##### Informational only Comments Road construction is or will be occurring. Use caution. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=20167) Last Updated 4/06/2026 1:51 AM #### ORE126: MP 1.3 to 1.5 ORE126B, Springfield ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 5/3/2026 12:00:00 AM Details Alert: OR126 Bus WB MP 1.3 to MP 1.5 (Willamette River Bridge - Springfield) Effective May 3, 2026, this section of OR126 Business westbound will be restricted to 13 feet 6 inches in width Sunday through Thursday nights between the hours of 7 PM & 5 AM. The estimated completion date for this work is May 15, 2026. Last Updated 4/14/2026 4:00 PM #### ORE126: MP 1.37 ORE126, Redmond ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 6/8/2026 12:00:00 AM Details Alert: OR126 EB & WB on- and off-ramp/turn to/from SE Veterans Way (Redmond) Effective June 8, 2026, beginning at 7 AM the OR126 eastbound & westbound on- and off-ramp/turn to/from SE Veterans Way will be closed at all hours. The estimated completion date for this work is June 14, 2026 at 5 PM. Last Updated 4/14/2026 4:00 PM #### ORE126: MP 1.4 to 2.5 ORE126B, Springfield ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 4/26/2026 12:00:00 AM Details Alert: OR126 Bus EB & WB MP 1.4 to MP 2.5 (Springfield) On Sunday April 26, 2026, this section of OR126 Business eastbound and westbound will be closed between the hours of 6 AM and 12 PM (noon), for the Eugene Marathon. Last Updated 4/14/2026 4:00 PM #### ORE126: EB MP 3.93 to 7.11 ORE126, Springfield ##### Construction Work ##### Estimated delay under 20 minutes Comments Road construction is occurring. Prepare to slow. Watch for workers. You can expect crews working during the day with lane and shoulder closures as needed. Please drive with caution and watch for workers. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-springfield) Last Updated 3/30/2026 6:21 PM #### ORE126: MP 10.5 to 10.6 ORE126, 4 miles East of Powell Butte ##### Commercial Vehicle Information ##### Informational only Details Alert: OR126 EB & WB at MP 10.54 (Redmond) Effective February 16, 2026, this section of OR126 eastbound and westbound will be restricted to 15 feet 00 inches in width at night from 7 PM to 7 AM. The estimated completion date for this work is April 30, 2026. Last Updated 4/14/2026 4:00 PM #### ORE126: MP 92.25 to 92.68 ORE126, Sisters ##### Commercial Vehicle Information ##### Informational only Details Alert: OR126 EB & WB MP 92.25 to MP 92.68 (Sisters) Effective October 1, 2025, this section of OR126 eastbound and westbound will be restricted to 10 feet 00 inches in width Sunday through Thursday nights between the hours of 8 PM & 7 AM. Loads over 10 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is May 22, 2026. Last Updated 4/14/2026 4:00 PM #### ORE126: MP 92.25 to 92.68 ORE126, Sisters ##### Commercial Vehicle Information ##### Informational only Details Alert: OR126 EB & WB MP 92.25 to MP 92.68 (Sisters) Effective October 1, 2025, this section of OR126 eastbound and westbound will be restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is May 22, 2026. Last Updated 4/14/2026 4:00 PM #### ORE126: MP 110.65 to 111.97 ORE126, Redmond ##### Construction Work ##### Estimated delay under 20 minutes Lanes Affected (Westbound) 1 Lane , Shoulder (Eastbound) 1 Lane , Shoulder Comments Road construction is occurring. Prepare to slow. Watch for workers. Expect single lane closures between 5th and 15th to construct new ADA ramps and enhance signal operations. Various corners will be closed to pedestrian traffic during this time. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/Projects/Pages/default.aspx) Last Updated 4/12/2026 11:48 PM ### [ORE138]() #### ORE138: MP 0.5 to 1.4 ORE138, Roseburg ##### Construction Work ##### No to Minimum Delay Comments Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Last Updated 4/02/2026 4:20 PM #### ORE138: MP 58 to 100.82 ##### Snow Zone ##### Informational only Affected Area North Umpqua - Toketee to US97 Intersection Minimum Chain Restriction Carry chains or traction tires regardless of conditions. [View more information on Chain Laws.](https://www.tripcheck.com/Pages/Chain-Law) ### [ORE141]() #### ORE141: MP 3.8 to 4.44 ORE141, Tigard ##### Construction Work ##### Estimated delay under 20 minutes Comments Traffic Impacts: No impacts. Project Description: In partnership with the City of Tigard and Washington County, we are working on a project to enhance safety on Hall Boulevard (Oregon Hwy 141). This project will install two new enhanced pedestrian crossings, or Rectangular Rapid Flashing Beacons, across SW Hall Boulevard at the intersections of SW Hemlock and SW Spruce streets. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22647) Last Updated 10/19/2025 6:14 AM #### ORE141: MP 7.07 to 3.3 ORE141, Tigard ##### Construction Work ##### No to Minimum Delay Comments Traffic Impacts: no impacts Project Description: In partnership with the City of Tigard and Washington County, we are working on a project to enhance safety on Hall Boulevard (Oregon Hwy 141). This project will install two new enhanced pedestrian crossings, or Rectangular Rapid Flashing Beacons, across SW Hall Boulevard at the intersections of SW Hemlock and SW Spruce streets. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=24010) Last Updated 6/08/2025 6:59 AM #### ORE141: MP 7.07 to 5.01 ORE141, Tigard ##### Construction Work ##### No to Minimum Delay Comments Traffic Impacts: Daytime lane shifts and sidewalk closures with accessible pedestrian detours on Hall Blvd. and 72nd Ave. Traffic holds of up to 20 mi \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22431) Last Updated 11/09/2025 5:54 PM ### [ORE153]() #### ORE153: MP 6 to 7 ORE153, Amity ##### Commercial Vehicle Information ##### Informational only Details Alert: OR153 EB & WB MP 6 to MP 7 (Amity) Effective January 5, 2026, this section of OR153 eastbound and westbound will be restricted to 18 feet 00 inches in width Monday through Thursday between the hours of 9 AM and 4 PM and Friday between the hours of 9 AM and 11:59 AM. Loads exceeding these dimensions may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is August 28, 2026. Last Updated 4/14/2026 4:00 PM ### [ORE173]() #### ORE173: MP 0.12 to 5.49 ##### Snow Zone ##### Informational only Affected Area Timberline - US26/Government Camp to Timberline Lodge Minimum Chain Restriction Carry chains or traction tires regardless of conditions. [View more information on Chain Laws.](https://www.tripcheck.com/Pages/Chain-Law) ### [ORE18B]() #### ORE18B: MP 2 to 2.67 ORE18B, Willamina ##### Construction Work ##### No to Minimum Delay Comments Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Work being performed to upgrade ADA curb ramps and sidewalk through Sheridan on the north and south sides of the roadway. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22556) Last Updated 4/06/2026 7:01 AM #### ORE18B: MP 5.94 to 7.6 ORE18B, Sheridan ##### Construction Work ##### No to Minimum Delay Comments Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Work being performed to upgrade ADA curb ramps and sidewalk through Sheridan on the north and south sides of the roadway. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22556) Last Updated 3/30/2026 6:36 PM ### [ORE201]() #### ORE201: MP 29.5 ORE201, Ontario ##### Crash/Hazard ##### No to Minimum Delay Comments The road surface has collapsed causing minimal delay to traffic. Use caution. Last Updated 4/13/2026 1:25 PM ### [ORE202]() #### ORE202: MP 12.43 ORE202, 2 miles South of Olney ##### Construction Work ##### No to Minimum Delay Comments Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Last Updated 3/30/2026 6:22 PM #### ORE202: MP 38.5 to 38.63 ORE202, 3 miles North of Birkenfeld ##### Maintenance Work ##### No to Minimum Delay Comments Bridge work is occurring causing minimal delay to traffic. Use caution. Bridge construction is occurring. Prepare to slow. Watch for workers. 3/11/26 - 10/28/26: MP 38.5 to MP 38.63 (Bridge structure ID: 03113A) portable traffic signal in place with 24-hour lane closure. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=23117) Last Updated 3/13/2026 6:05 AM #### ORE202: MP 38.5 to 38.63 ORE202, 3 miles North of Birkenfeld ##### Commercial Vehicle Information ##### Informational only Details Alert: OR202 EB & WB MP 38.5 to 38.63 (Vesper) Effective March 11, 2026, this section of OR202 eastbound and westbound will be restricted to 12 feet 00 inches in width at all hours. The estimated completion date for this work is October 27, 2026. Last Updated 4/14/2026 4:00 PM ### [ORE204]() #### ORE204: MP 0.4 to 10.58 ##### Snow Zone ##### Informational only Affected Area Weston Mountain (Elev. 3200') - Intersection with OR11 to Tollgate Minimum Chain Restriction Carry chains or traction tires regardless of conditions. [View more information on Chain Laws.](https://www.tripcheck.com/Pages/Chain-Law) #### ORE204: MP 10.59 to 39.45 ##### Snow Zone ##### Informational only Affected Area Blue Mountain Summit (Elev. 5158') - Tollgate to Elgin Minimum Chain Restriction Carry chains or traction tires regardless of conditions. [View more information on Chain Laws.](https://www.tripcheck.com/Pages/Chain-Law) ### [ORE207]() #### ORE207: MP 4.3 to 36 ##### Snow Zone ##### Informational only Affected Area Heppner-Spray Mountain (Elev. 4612') Minimum Chain Restriction Carry chains or traction tires regardless of conditions. [View more information on Chain Laws.](https://www.tripcheck.com/Pages/Chain-Law) ### [ORE211]() #### ORE211: MP 11.8 ORE211, Molalla ##### Construction Work ##### No to Minimum Delay Comments Traffic Impacts: Lane shifts and sidewalk closures expected. Project Description: A private development is underway off OR 211 near Ona Way in Molalla. Last Updated 9/28/2025 8:36 AM #### ORE211: MP 12.33 to 12.34 ORE211, Molalla ##### Commercial Vehicle Information ##### Informational only Details Alert: OR211 EB and WB MP 12.33 to MP 12.34 (Molalla) Effective April 07, 2026, this section of OR211 eastbound and westbound will be restricted to 10 feet 00 inches in width daily between the hours of 10 AM and 3:30 PM. Loads wider than 10 feet 00 inches may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is April 14, 2026. Last Updated 4/14/2026 4:00 PM ### [ORE213]() #### ORE213: MP 7.23 to 7.41 ORE213, Portland ##### Construction Work ##### Informational only Comments Day and nighttime single lane closures on SE 82 Ave. (OR 213) between SE Foster Rd. and SE Lindy St. Project Description: We are repaving and making safety improvements on SE 82nd Avenue from SE Foster Road to SE Thompson Road. We will repave SE 82nd Avenue in both directions between SE Foster Road and SE Lindy Street. Pedestrian safety improvements from SE Foster to SE Thompson Road include four new Rectangular Rapid Flashing Beacons (RRFBs), upgrades to curb ramps that meet Americans with Disabilities Act (ADA) requirements and adding new sidewalks between SE Clatsop Street and SE Cornwell Street. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21177) Last Updated 1/27/2026 4:06 PM ### [ORE217]() #### ORE217: SB MP 2 to 6 ORE217, 2 miles South of US 26 ##### Construction Work ##### No to Minimum Delay Comments Nighttime intermittent shoulder closures on OR 217 southbound Monday through Thursday nights. Project Description: This project addresses long-standing congestion on OR 217 between Beaverton-Hillsdale Highway and OR 99W due to too many closely spaced interchanges: 10 interchanges in just over seven miles! This is some of the shortest merging spacing in the region. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/OR217/Pages/default.aspx) Last Updated 4/06/2026 12:29 AM ### [ORE219]() #### ORE219: MP 18.35 to 20.8 ORE219, Newberg ##### Construction Work ##### Estimated delay under 20 minutes Comments Road construction is occurring. Prepare to slow. Watch for workers. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-newberg) Last Updated 3/30/2026 6:34 PM ### [ORE22]() #### ORE22: MP 21 to 24.07 ORE22, 4 miles West of Salem ##### Construction Work ##### Estimated delay under 20 minutes Lanes Affected (Westbound) , Shoulder Comments Road construction is occurring. Prepare to slow. Watch for workers. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-salem) Last Updated 4/07/2026 7:43 PM ### [ORE223]() #### ORE223: MP 2.13 to 4.28 ORE223, Dallas ##### Construction Work ##### No to Minimum Delay Lanes Affected (Northbound) 1 Lane (Southbound) 1 Lane Comments Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Potential short, intermittent delays due to curb ramp construction. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22555) Last Updated 3/30/2026 6:20 PM ### [ORE224]() #### ORE224: EB MP 0 to 2.7 ORE224, Intersection with Pacific Highway East ORE 99E (McLoughlin Blvd) ##### Construction Work ##### No to Minimum Delay Comments Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Last Updated 4/17/2025 3:08 PM #### ORE224: MP 0.78 ORE224, 1 mile East of Intersection with Pacific Highway East ORE 99E (McLoughlin Blvd) ##### Maintenance Work ##### Closure with Detour Lanes Affected (Westbound) 1 Lane Comments Roadwork has the Westbound right turn lane to Monroe closed, use alternate route. Last Updated 4/08/2026 1:41 PM #### ORE224: MP 36 to 37 ORE224, 13 miles East of Estacada ##### Construction Work ##### No to Minimum Delay Comments No traffic impacts expected. Project Description: Repairs are being made on OR 224 at milepost 36.7 (approximately 10 miles east of Estacada) after a winter storm event in December. Last Updated 4/10/2026 2:53 PM ### [ORE229]() #### ORE229: MP 14.1 to 14.3 ORE229, 10 miles North of Siletz ##### Commercial Vehicle Information ##### Informational only Details Alert: OR229 NB & SB MP 14.18 (Siletz) Effective December 12, 2025, this section of OR229 northbound and southbound will be closed due to a landslide. There is no estimated date that the road will reopen at this time. Last Updated 4/14/2026 4:00 PM #### ORE229: MP 14.2 to 15.1 ORE229, 10 miles North of Siletz ##### Crash/Hazard ##### Closure Lanes Affected (Northbound) Median , 1 Lane , Shoulder (Southbound) Median , 1 Lane , Shoulder Comments A landslide has occurred. Use an alternate route. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/Regions/Pages/OR229.aspx) Last Updated 4/11/2026 10:34 PM ### [ORE230]() #### ORE230: MP 0 to 23.8 ##### Snow Zone ##### Informational only Affected Area West Diamond Lake - OR62 to OR138 Minimum Chain Restriction Carry chains or traction tires regardless of conditions. [View more information on Chain Laws.](https://www.tripcheck.com/Pages/Chain-Law) ### [ORE234]() #### ORE234: MP 14.66 to 15.37 ORE234, 3 miles West of Intersection with Crater Lake Highway ORE62 ##### Construction Work ##### Estimated delay under 20 minutes Lanes Affected (Westbound) 1 Lane (Eastbound) 1 Lane Comments Sunken pavement; use caution. Crews will return in the spring to complete repairs and install safety features. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=M25033) Last Updated 3/09/2026 10:41 AM ### [ORE237]() #### ORE237: MP 31.54 to 32.15 ORE237, North Powder ##### Construction Work ##### No to Minimum Delay Lanes Affected (Northbound) , Shoulder (Southbound) , Shoulder Comments Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Crews will be on site prepping, forming, pouring, milling, paving and working on landscape. Use caution, prepare to slow, obey all traffic signs throughout work zone(s). Last Updated 4/07/2026 1:16 AM ### [ORE240]() #### ORE240: MP 11.04 to 11.26 ORE240, Newberg ##### Construction Work ##### No to Minimum Delay Comments Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-newberg) Last Updated 3/30/2026 6:34 PM ### [ORE241]() #### ORE241: MP 3.5 to 3.8 ORE241, 3 miles East of Coos Bay ##### Maintenance Work ##### No to Minimum Delay Comments Bridge work is occurring causing minimal delay to traffic. Use caution. Last Updated 4/02/2026 4:18 PM #### ORE241: MP 3.55 to 3.82 ORE241, 3 miles East of Coos Bay ##### Commercial Vehicle Information ##### Informational only Details Alert: OR241 EB & WB MP 3.55 to MP 3.82 (Coos Bay) Effective August 13, 2025, this section of OR241 eastbound and westbound will be restricted to 14 feet 00 inches in width at all hours. The estimated completion date for this work is September 30, 2026. Last Updated 4/14/2026 4:00 PM ### [ORE242]() #### ORE242: MP 61.91 to 84 ORE242, 7 miles East of Intersection with McKenzie Highway ORE126 ##### Information ##### Seasonal Closure Comments The highway is closed for the season. Use alternate route. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/regions/pages/mckenzie-highway.aspx) Last Updated 2/03/2026 9:46 AM ### [ORE260]() #### ORE260: MP 15.2 ORE260, 7 miles East of Intersection with Redwood Highway US199 ##### Crash/Hazard ##### No to Minimum Delay Lanes Affected (Westbound) 1 Lane Comments A landslide has occurred causing minimal delay to traffic. Use caution. Last Updated 3/31/2026 4:12 PM ### [ORE35]() #### ORE35: MP 60 to 83.56 ##### Snow Zone ##### Informational only Affected Area White River - Jct US26 to ODOT Maintenance Station Minimum Chain Restriction Carry chains or traction tires regardless of conditions. [View more information on Chain Laws.](https://www.tripcheck.com/Pages/Chain-Law) ### [ORE38]() #### ORE38: MP 4.9 ORE38, 5 miles East of Intersection with Oregon Coast Highway US101 ##### Construction Work ##### Estimated delay under 20 minutes Comments Road construction is occurring. Prepare to slow. Watch for workers. Last Updated 4/02/2026 4:19 PM ### [ORE413]() #### ORE413: MP 11.03 to 11.45 ORE413, Intersection with Pine Creek Highway ##### Construction Work ##### Informational only Comments Road construction is or will be occurring. Use caution. Last Updated 3/24/2026 1:09 PM ### [ORE42]() #### ORE42: EB MP 0 to 9.7 ORE42, Intersection with Oregon Coast Highway US101 ##### Construction Work ##### Estimated delay under 20 minutes Comments Road construction is occurring. Prepare to slow. Watch for workers. Last Updated 4/02/2026 4:17 PM #### ORE42: MP 20.8 to 21.9 ORE42, Myrtle Point ##### Construction Work ##### No to Minimum Delay Comments Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Last Updated 4/02/2026 4:17 PM #### ORE42: MP 36.1 ORE42, 1 mile West of Remote ##### Maintenance Work ##### Estimated delay under 20 minutes Lanes Affected (Westbound) 1 Lane (Eastbound) 1 Lane Comments Road maintenance operations are occurring. Prepare to slow or move over for worker safety. Last Updated 4/08/2026 11:31 PM #### ORE42: MP 72 to 77 ORE42, 1 mile West of Winston ##### Construction Work ##### Estimated delay under 20 minutes Comments Road construction is occurring. Prepare to slow. Watch for workers. Last Updated 4/02/2026 4:20 PM #### ORE42: MP 72.54 to 76.95 ORE42, Winston ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 4/26/2026 12:00:00 AM Details Alert: OR42 EB & WB MP 72.54 to MP 76.95 (Winston) Effective April 26, 2026, this section of OR42 eastbound and westbound will be restricted to 14 feet 00 inches in width at all hours beginning Sundays at 6 PM through Fridays at 3 PM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is August 12, 2026. Last Updated 4/14/2026 4:00 PM #### ORE42: MP 72.76 to 73 ORE42, Winston ##### Construction Work ##### No to Minimum Delay Comments Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Last Updated 3/03/2026 8:07 PM ### [ORE43]() #### ORE43: MP 11.08 ORE43, Interstate 205 ##### Commercial Vehicle Information ##### Informational only Details Alert: OR43 SB off-ramp to I-205 NB (West Linn) Effective April 6, 2026, the OR43 southbound off-ramp to I-205 northbound will be closed Monday through Thursday nights between the hours of 10 PM and 5 AM, Friday nights between the hours of 10 PM and 7 AM, and Saturday nights between the hours of 10 PM & 8 AM. The estimated completion date for this work is May 9, 2026. Last Updated 4/14/2026 4:00 PM #### ORE43: MP 11.13 to 11.18 ORE43, Interstate 205 ##### Commercial Vehicle Information ##### Informational only Details Alert: OR43 NB MP 11.13 to MP 11.18 (West Linn) Effective March 2, 2026, this section of OR43 northbound will be closed Monday through Friday nights between the hours of 8 PM & 6 AM and Saturday nights between the hours of 8 PM & 9 AM. The estimated completion date for this work is May 9, 2026. Last Updated 4/14/2026 4:00 PM #### ORE43: MP 11.13 to 11.18 ORE43, Interstate 205 ##### Commercial Vehicle Information ##### Informational only Details Alert: OR43 SB MP 11.13 to MP 11.18 (West Linn) Effective, March 2, 2026, this section of OR43 southbound will be closed Monday through Friday nights between the hours of 8 PM & 6 AM and Saturday nights between the hours of 8 PM & 9 AM. The estimated completion date for this work is May 9, 2026. Last Updated 4/14/2026 4:00 PM ### [ORE451]() #### ORE451: MP 10.28 to 10.35 ORE451, Intersection with Central Oregon Highway ORE7 ##### Construction Work ##### Estimated delay under 20 minutes Lanes Affected (Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder Comments Road construction is occurring. Prepare to slow. Watch for workers. Crews will be onsite preparing demolition and reconstruction of sidewalk and ADA ramps. Expect possible daytime lane and shoulder closures with flagging. Use caution, prepare to slow. Last Updated 4/13/2026 2:13 AM ### [ORE47]() #### ORE47: MP 62 ORE47, 2 miles South of Vernonia ##### Crash/Hazard ##### Estimated delay under 20 minutes Comments A crash has occurred. Prepare to slow or move over for worker safety. Last Updated 4/14/2026 7:36 PM ### [ORE51]() #### ORE51: MP 5.81 to 6.34 ORE51, Independence ##### Construction Work ##### No to Minimum Delay Comments Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. You can expect crews working during the day with lane and shoulder closures as needed. Please drive with caution and watch for workers. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-OR51) Last Updated 3/30/2026 6:20 PM ### [ORE53]() #### ORE53: MP 11 ORE53, Clatsop - Tillamook County Line ##### Crash/Hazard ##### No to Minimum Delay Comments Sunken pavement is causing minimal delay to traffic. Use caution. Last Updated 3/30/2026 6:35 PM ### [ORE540]() #### ORE540: MP 0.79 to 0.9 ORE540, North Bend ##### Construction Work ##### Estimated delay under 20 minutes Lanes Affected (Southbound) 1 Lane Comments Road construction is occurring. Prepare to slow. Watch for workers. Last Updated 4/06/2026 7:01 PM ### [ORE551]() #### ORE551: MP 5 ORE551, 1 mile North of Intersection with Pacific Highway East ORE99E ##### Crash/Hazard ##### Estimated delay under 20 minutes Comments Hazardous tree or vegetation. Prepare to slow. Last Updated 4/14/2026 7:55 PM ### [ORE58]() #### ORE58: MP 42 to 44 ORE58, 3 miles West of McCredie Springs ##### Maintenance Work ##### Estimated delay under 20 minutes Lanes Affected (Westbound) 1 Lane (Eastbound) 1 Lane Comments Bridge work is occurring. Prepare to slow. Expect daytime single lane closures with an automatic flagger assistant device helping direct traffic east of Oakridge near milepost 43, construction noise and delays up to 20 minutes. Work is currently scheduled to be Monday through Friday. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22557) Last Updated 1/04/2026 12:26 PM #### ORE58: MP 86 to 71 ORE58, Intersection with The Dalles - California Highway US97 ##### Maintenance Work ##### No to Minimum Delay Comments Road maintenance operations are occurring causing minimal delay to traffic. Prepare to slow or move over for worker safety. Last Updated 4/14/2026 5:18 PM ### [ORE6]() #### ORE6: MP 1 to 51.58 ORE6, 1 mile East of Tillamook ##### Construction Work ##### No to Minimum Delay Comments Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. 2/1/26 - 3/30/26: MP 5.69 to MP 5.82 (Bridge structure ID: 01868) portable traffic signal in place with 24-hour lane closure. Bridge work, use caution, watch for workers and slowdown in the work zone. 3/31/26 - 4/30/26: MP 19.78 to MP 19.88 (Bridge Structure ID: 16641) automated flagger assistance device in place with 24-hour lane closure. Bridge work, use caution, watch for workers and slowdown in the work zone. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22509) Last Updated 3/30/2026 6:33 PM #### ORE6: MP 5.69 to 5.82 ORE6, 6 miles East of Tillamook ##### Construction Work ##### Estimated delay under 20 minutes Comments Road construction is occurring. Prepare to slow. Watch for workers. 2/1/26 - 3/30/26: MP 5.69 to MP 5.82 (Bridge structure ID: 01868) portable traffic signal in place with 24-hour lane closure. Bridge work, use caution, watch for workers and slowdown in the work zone. 3/31/26 - 4/30/26: MP 19.78 to MP 19.88 (Bridge Structure ID: 16641) automated flagger assistance device in place with 24-hour lane closure. Bridge work, use caution, watch for workers and slowdown in the work zone. Last Updated 3/30/2026 6:33 PM #### ORE6: MP 5.69 to 5.82 ORE6, 6 miles East of Tillamook ##### Commercial Vehicle Information ##### Informational only Details Alert: OR6 EB & WB MP 5.69 to 5.82 (Mills Creek Bridge) Effective February 1, 2026, this section of OR6 eastbound and westbound will be restricted to 12 feet 00 inches in width at all hours. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for information. The estimated completion date for this work is April 30, 2026. Last Updated 4/14/2026 4:00 PM #### ORE6: MP 19.78 to 19.88 ORE6, 19 miles West of Glenwood ##### Construction Work ##### No to Minimum Delay Comments Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. 2/1/26 - 3/30/26: MP 5.69 to MP 5.82 (Bridge structure ID: 01868) portable traffic signal in place with 24-hour lane closure. Bridge work, use caution, watch for workers and slowdown in the work zone. 3/31/26 - 4/30/26: MP 19.78 to MP 19.88 (Bridge Structure ID: 16641) automated flagger assistance device in place with 24-hour lane closure. Bridge work, use caution, watch for workers and slowdown in the work zone. Last Updated 1/15/2026 1:59 PM #### ORE6: MP 19.78 to 19.88 ORE6, 19 miles West of Glenwood ##### Commercial Vehicle Information ##### Informational only Details Alert: OR6 EB & WB MP 19.78 to 19.88 (Fisherman's Foot Bridge) Effective February 1, 2026, this section of OR6 eastbound and westbound will be restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for information. The estimated completion date for this work is April 30, 2026. Last Updated 4/14/2026 4:00 PM #### ORE6: MP 32.05 to 32.1 ORE6, 7 miles West of Glenwood ##### Construction Work ##### No to Minimum Delay Comments Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Work is planned to begin in February. Single lane closure Monday through Thursday 7am to 7pm, Friday single lane closure 7am to noon. Use caution, watch for workers and slow down in the work zone. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21737) Last Updated 3/30/2026 6:22 PM #### ORE6: MP 32.05 to 32.1 ORE6, 7 miles West of Glenwood ##### Commercial Vehicle Information ##### Informational only Details Alert: OR6 EB & WB MP 32.05 to 32.1 (Devils Lake Fork Wilson River Bridge) Effective February 9, 2026, this section of OR6 eastbound and westbound will be restricted to 20,000 lbs. single axle, 34,000 lbs. tandem axle - 105,500 lbs GVW, Weight Table 2, for all loads at all hours. The estimated completion date for this work is August 28, 2026. Last Updated 4/14/2026 4:00 PM #### ORE6: MP 33 to 42 ORE6, Tillamook - Washington County Line ##### Maintenance Work ##### No to Minimum Delay Comments Road maintenance operations are occurring causing minimal delay to traffic. Prepare to slow or move over for worker safety. Watch for flaggers and workers. New guardrail will be installed the week of 1/19/26. Last Updated 3/30/2026 6:36 PM #### ORE6: MP 49 to 51 ORE6, Intersection with Nehalem Highway ORE47 ##### Maintenance Work ##### Estimated delay under 20 minutes Lanes Affected (Westbound) 1 Lane (Eastbound) 1 Lane Comments Road maintenance operations are occurring. Prepare to slow or move over for worker safety. Last Updated 3/30/2026 6:19 PM ### [ORE62]() #### ORE62: MP 35.23 to 35.54 ORE62, 15 miles East of Shady Cove ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 4/29/2026 12:00:00 AM Details Alert: OR62 EB & WB MP 35.23 to MP 35.54 (Shady Cove) Effective April 29, 2026, this section of OR62 eastbound and westbound will be restricted to 17 feet 00 inches in width at all hours. The estimated completion date for this work is September 30, 2026. Last Updated 4/14/2026 4:00 PM ### [ORE7]() #### ORE7: MP 0.07 to 25 ##### Snow Zone ##### Informational only Affected Area Tipton Summit (Elev. 5124') and Larch Summit (Elev. 5082') - Near the jct with US26 to the jct of ORE410 Minimum Chain Restriction Carry chains or traction tires regardless of conditions. [View more information on Chain Laws.](https://www.tripcheck.com/Pages/Chain-Law) #### ORE7: MP 36.4 to 33 ##### Snow Zone ##### Informational only Affected Area Mason Dam Hill SB - Whitman National Forest to west of Hwy 245 Jct Minimum Chain Restriction Carry chains or traction tires regardless of conditions. [View more information on Chain Laws.](https://www.tripcheck.com/Pages/Chain-Law) ### [ORE8]() #### ORE8: WB MP 2.91 to 7.29 ORE8, Highway 217 ##### Construction Work ##### No to Minimum Delay Comments Traffic Impacts: No Impacts. Work is temporarily suspended. We are installing new overhead and underground fiber optic cable where gaps exist along OR 8 between SW 198th Avenue and OR 217. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21617) Last Updated 12/09/2025 8:27 AM #### ORE8: MP 3.82 to 3.51 ORE8, 1 mile West of Highway 217 ##### Construction Work ##### No to Minimum Delay Comments Lane closures, turning restrictions on Canyon Road near Rose Biggi Avenue and Cedar Hills. • Travelers can expect around-the-clock lane reduction for two weeks on Canyon Rd. between SW Hall Blvd and Cedar Hills Blvd, ending by April 9. This partnership project between ODOT, City of Beaverton and Metro will improve pedestrian safety on SW Canyon Road (OR 8) from SW Hall Boulevard to SW Cedar Hills Boulevard in Central Beaverton by adding two new crosswalks, a flashing beacon, new lighting and a landscaped center median. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=18758) Last Updated 4/03/2026 7:56 PM #### ORE8: MP 17.6 to 17.7 ORE47, Forest Grove ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 5/4/2026 12:00:00 AM Details Alert: OR8 EB and WB MP 17.6 to MP 17.7 (Cornelius) Effective May 4, 2026, this section of OR8 eastbound and westbound will be restricted to 14 feet 00 inches in width Monday through Thursday between the hours of 8 AM and 3 PM and Friday between the hours of 9 AM and 2 PM. Loads wider than 14 feet 00 inches may be accommodated on a case-by-case basis Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is June 8, 2026. Last Updated 4/14/2026 4:00 PM ### [ORE86]() #### ORE86: MP 34.01 to 70.58 ORE86, 7 miles West of Richland ##### Construction Work ##### Estimated delay under 20 minutes Lanes Affected (Westbound) Median , 1 Lane , Shoulder (Eastbound) Median , 1 Lane , Shoulder Comments Road construction is occurring. Prepare to slow. Watch for workers. Crews will be onsite replacing guardrail at various locations. Expect daytime lane closures with flagging. Last Updated 4/13/2026 2:12 AM #### ORE86: MP 42.01 to 42.4 ORE86, Richland ##### Construction Work ##### Informational only Comments Road construction is or will be occurring. Use caution. Last Updated 3/24/2026 1:11 PM ### [ORE99]() #### ORE99: MP 10.18 to 10.99 ORE99, 1 mile North of Phoenix ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 4/27/2026 12:00:00 AM Details Alert: OR99 NB & SB MP 10.18 to MP 10.99 (Phoenix) Effective April 27, 2026, this section of OR99 northbound and southbound will be restricted to 11 feet 00 inches in width at all hours. Loads wider than 11 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for more information. The anticipated completion date for this work is May 1, 2026. Last Updated 4/14/2026 4:00 PM #### ORE99: MP 10.2 to 11.25 ORE99, 1 mile North of Phoenix ##### Construction Work ##### Estimated delay under 20 minutes Lanes Affected (Northbound) 2 Lanes , Shoulder (Southbound) 2 Lanes , Shoulder Comments Road construction is occurring. Prepare to slow. Watch for workers. Expect intermittent lane closures through the work zone on OR 99, Monday through Friday. Last Updated 4/03/2026 8:00 AM #### ORE99: MP 14.42 to 16.09 ORE99, Cottage Grove ##### Construction Work ##### No to Minimum Delay Comments Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. You can expect crews working during the day with lane and shoulder closures as needed. Please drive with caution and watch for workers. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-cottagegrove) Last Updated 3/30/2026 6:21 PM ### [ORE99E]() #### ORE99E: MP 11.63 ORE99E, Oregon City ##### Commercial Vehicle Information ##### Informational only Details Alert: OR99E SB off-ramp to I-205 SB (Oregon City) Effective March 2, 2026, the OR99E southbound off-ramp to I-205 southbound will be intermittently closed Monday through Thursday nights between the hours of 10 PM and 5 AM. The estimated completion date for this work is May 9, 2026. Last Updated 4/14/2026 4:00 PM #### ORE99E: MP 40.75 to 40.81 ORE99E, Brooks ##### Construction Work ##### Estimated delay under 20 minutes Lanes Affected (Northbound) 1 Lane Comments Road construction is occurring. Prepare to slow. Watch for workers. Last Updated 2/12/2026 4:20 PM ### [ORE99W]() #### ORE99W: NB MP 23.23 to 24.49 ORE99W, Intersection with Hillsboro - Silverton Highway ORE214 ##### Construction Work ##### No to Minimum Delay Comments Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-newberg) Last Updated 3/30/2026 6:34 PM #### ORE99W: MP 44 to 45 ORE99W, Amity ##### Commercial Vehicle Information ##### Informational only Details Alert: OR99W NB & SB MP 44 to MP 45 (Amity) Effective January 5, 2026, this section of OR99W northbound and southbound will be restricted to 18 feet 00 inches in width Monday through Thursday between the hours of 9 AM and 4 PM and on Friday between the hours of 9 AM and 11:59 AM. Loads exceeding these dimensions may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is August 28, 2026. Last Updated 4/14/2026 4:00 PM #### ORE99W: MP 63.17 to 63.57 ORE99W, Monmouth ##### Construction Work ##### No to Minimum Delay Comments Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. You can expect crews working during the day with lane and shoulder closures as needed. Please drive with caution and watch for workers. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22985-OR51) Last Updated 3/30/2026 6:21 PM ### [HWY100]() #### HWY100: MP 18 to 19.92 HWY100, 4 miles West of Ainsworth State Park ##### Construction Work ##### Closure Comments A section of the Historic Columbia River Highway/U.S. 30 between Multnomah Falls and Oneonta Trailhead is closed to all users until Spring 2026. I-84 is open. Use I-84 Exit 31 or take transit to visit Multnomah Falls. There is no vehicle, pedestrian or bicycle access to Multnomah Falls heading westbound on the Historic Highway from Exit 35. The Oneonta trailhead is open to hikers, with limited parking. Project Description: Two 100 year-old elevated roadways that provide access to Multnomah Falls require repairs to continue providing access to one of Oregon's most iconic sites. The elevated roadways – called viaducts – carry vehicles and bicycles to the Falls and Lodge from the Historic Columbia River Highway. The east viaduct will be closed fall 2025 through spring 2026. Restoration work to the west viaduct on the Historic Columbia River Highway (U.S. 30) between Wahkeena Falls and Multnomah Falls was completed in May 2025. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=17479) Last Updated 4/03/2026 7:47 PM ### [HWY372]() #### HWY372: MP 9 to 21.98 ##### Snow Zone ##### Informational only Affected Area Century Drive - West of Bend to Mt. Bachelor Ski Area Minimum Chain Restriction Carry chains or traction tires regardless of conditions. [View more information on Chain Laws.](https://www.tripcheck.com/Pages/Chain-Law) Print [Back to Top](https://www.tripcheck.com/DynamicReports/Report/RoadConditions) - [Map](https://www.tripcheck.com/) - [Road Conditions](https://www.tripcheck.com/DynamicReports/Report/RoadConditions) - [Travel Time](https://www.tripcheck.com/DynamicReports/Report/TravelTime) - [NOAA Forecasts](https://www.tripcheck.com/DynamicReports/Report/NoaaForecasts) - [Weather Stations](https://www.tripcheck.com/DynamicReports/Report/WeatherStations) - [Cameras](https://www.tripcheck.com/DynamicReports/Report/Cameras) - [Printable Condition Report](https://www.tripcheck.com/Reports/PrintableConditionReport.pdf?v=887279168) Copyright © 2026. All Rights Reserved. [Oregon Department of Transportation](http://www.oregon.gov/odot/). # Your Opinion Matters\! Please take a short survey (5 minutes or less) and help us understand what features are most important to you and what we could improve about TripCheck services. Thank you\! [Take Survey](http://oregonstate.qualtrics.com/jfe/form/SV_dmACzPeen1mMhJr) [Close]()
Readable Markdown
#### I-5: MP 26 to 28.4 I-5, Medford ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 5/4/2026 12:00:00 AM Details Alert: I-5 NB MP 26.00 to MP 28.40 (Medford) Effective May 4, 2026, this section of I-5 northbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 7:00 PM and 7:00 AM. The estimated completion date for this work is May 4, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: MP 26 to 28.4 I-5, Medford ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 4/21/2026 12:00:00 AM Details Alert: I-5 NB MP 26.00 to MP 28.40 (Medford) Effective April 21, 2026, this section of I-5 northbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 7:00 PM and 7:00 AM. The estimated completion date for this work is April 24, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: MP 26.8 to 27.2 I-5, Medford ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 4/21/2026 12:00:00 AM Details Alert: I-5 NB Exit 27 off-ramp to Highland Drive/Garfield St (Medford) Effective April 21, 2026, the I-5 northbound Exit 27 off-ramp to Highland Drive/Garfield Street, will be closed Sunday through Thursday nights from 7:00 PM to 7:00 AM. The estimated completion date for this work is April 24, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: MP 35.47 to 36.06 I-5, 2 miles North of Central Point ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 5/4/2026 12:00:00 AM Details Alert: I-5 NB & SB MP 35.47 to MP 36.06 (Central Point) Effective May 4, 2026, this section of I-5 northbound and southbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 7:00 PM and 7:00 AM. The estimated completion date for this work is May 4, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: MP 35.47 to 36.06 I-5, 2 miles North of Central Point ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 4/19/2026 12:00:00 AM Details Alert: I-5 NB & SB MP 35.47 to MP 36.06 (Central Point) Effective April 19, 2026, this section of I-5 northbound and southbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between the hours of 7:00 PM and 7:00 AM. The estimated completion date for this work is April 21, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: MP 35.7 I-5, Intersection with Pacific Highway East ORE99E ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 4/19/2026 12:00:00 AM Details Alert: I-5 NB Exit 35 on-ramp from OR140/Blackwell Rd (Central Point) Effective April 19, 2026, the I-5 northbound Exit 35 on-ramp from OR140/Blackwell Road, will be closed Sunday through Thursday nights from 7:00 PM to 7:00 AM. The estimated completion date for this work is April 21, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: NB MP 58.18 to 66.7 I-5, Intersection with Pacific Highway ORE99 ##### Construction Work ##### Estimated delay under 20 minutes Lanes Affected (Southbound) , Shoulder (Northbound) , Shoulder Road construction is occurring. Prepare to slow. Watch for workers. Expect intermittent lane and shoulder closures Sunday – Friday from 7 a.m. – 7 p.m. \<!--Links Start Here--\> \[Link to additional information\](https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.oregon.gov%2Fodot%2Fprojects%2Fpages%2Fproject-details.aspx%3Fproject%3D21674\&data=05%7C02%7CCarter.B.HARPER%40odot.oregon.gov%7C317a6bfac3c14ad58b8808de0b344b86%7C28b0d01346bc4a648d861c8a31cf590d%7C0%7C0%7C638960516398910346%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C\&sdata=k%2FDlSc6c62l%2F5z4iMoJ%2FdoDe40RmykdT3DPFi%2BolSjY%3D\&reserved=0) Last Updated 4/02/2026 4:21 PM #### I-5: MP 58.3 I-5, Intersection with Pacific Highway ORE99 ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 5/10/2026 12:00:00 AM Details Alert: I-5 SB Exit 58 off-ramp to OR99/US199/NE Scoville Rd (Grants Pass) Effective May 10, 2026, the I-5 southbound Exit 58 off-ramp to OR99/US199/NE Scoville Road will be closed Sunday through Friday from 7:00 PM to 7:00 AM. The estimated completion date for this work is May 14, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: MP 58.52 to 61.68 I-5, Grants Pass ##### Commercial Vehicle Information ##### Informational only Details Alert: I-5 NB MP 58.52 to 61.68 (Grants Pass) Effective November 20, 2025, this section of I-5 northbound will be restricted to 12 feet 00 inches in width Sunday through Thursday nights between the hours of 7:00 pm and 7:00 am. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for more information. The estimated completion date for this work is October 15, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: NB MP 59 to 61 I-5, Grants Pass ##### Maintenance Work ##### Estimated delay under 20 minutes Lanes Affected (Northbound) 1 Lane Road maintenance operations are occurring. Prepare to slow or move over for worker safety. Last Updated 4/14/2026 6:44 PM #### I-5: MP 59.94 I-5, 2 miles North of Grants Pass ##### Commercial Vehicle Information ##### Informational only Details Alert: I-5 SB MP 59.94 (Grants Pass) Effective January 1, 2026, this section of I-5 southbound will be restricted to 17 feet 1 inches in height Sunday through Thursday nights between the hours of 7:00 pm and 7:00 am. The estimated completion date for this work is October 15, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: SB MP 61 to 59 I-5, 3 miles North of Grants Pass ##### Maintenance Work ##### No to Minimum Delay Road maintenance operations are occurring causing minimal delay to traffic. Prepare to slow or move over for worker safety. Last Updated 4/14/2026 7:30 PM #### I-5: MP 61 I-5, 3 miles North of Grants Pass ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 4/26/2026 12:00:00 AM Details Alert: I-5 SB Exit 61 on-ramp from Monument Drive (Grants Pass) Effective April 26, 2026, the I-5 southbound Exit 61 on-ramp from Monument Drive, will be closed Sunday through Thursday nights from 7:00 PM to 7:00 AM. The estimated completion date for this work is May 1, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: MP 62 to 58.17 I-5, 4 miles North of Grants Pass ##### Commercial Vehicle Information ##### Informational only Details Alert: I-5 SB MP 62.00 to 58.17 (Grants Pass) Effective January 1, 2026, this section of I-5 southbound will be restricted to 12 feet 00 inches in width Sunday through Thursday nights between the hours of 7:00 pm and 7:00 am. Loads over 12 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over Dimension Permit Unit for more information. The estimated completion date for this work is October 15, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: NB MP 65 to 66 I-5, 7 miles North of Grants Pass ##### Maintenance Work ##### Estimated delay under 20 minutes Lanes Affected (Northbound) 1 Lane Road maintenance operations are occurring. Prepare to slow or move over for worker safety. Last Updated 4/14/2026 6:45 PM #### I-5: MP 66 I-5, 8 miles North of Grants Pass ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 5/3/2026 12:00:00 AM Details Alert: I-5 NB Exit 66 off-ramp to Monument Dr (Grants Pass) Effective May 3, 2026, the I-5 northbound Exit 66 off-ramp to Monument Drive will be closed Sunday through Thursday nights from 7:00 PM to 7:00 AM. The estimated completion date for this work is May 8, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: MP 66 I-5, 8 miles North of Grants Pass ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 4/27/2026 12:00:00 AM Details Alert: I-5 SB Exit 66 on-ramp from Monument Drive (Grants Pass) Effective April 27, 2026, the I-5 southbound Exit 66 on-ramp from Monument Drive will be closed Monday through Thursday nights from 7:00 PM to 7:00 AM. The estimated completion date for this work is May 1, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: SB MP 68 to 64 I-5, 8 miles South of Wolf Creek ##### Maintenance Work ##### Estimated delay under 20 minutes Lanes Affected (Southbound) 1 Lane Road maintenance operations are occurring. Prepare to slow or move over for worker safety. Last Updated 4/14/2026 6:45 PM #### I-5: SB MP 103 I-5, 5 miles North of Canyonville ##### Maintenance Work ##### Closure ##### Off Ramp Road maintenance operations are occurring. Use an alternate route. Ramps Affected. Last Updated 4/14/2026 6:33 PM #### I-5: MP 119.3 to 119.7 I-5, Intersection with Coos Bay - Roseburg Highway ORE42 ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 4/26/2026 12:00:00 AM Details Alert: I-5 SB Exit 119 on/off-ramps to/from OR42 (Winston) Effective April 26, 2026, the I-5 southbound Exit 119 on/off ramps to/from OR42 will be intermittently closed Sunday through Thursday nights between the hours of 6:00 PM and 6:00 AM. The estimated completion date for this work is May 13, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: MP 119.7 to 119.9 I-5, 5 miles South of Roseburg ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 4/26/2026 12:00:00 AM Details Alert: I-5 NB Exit 119 on/off-ramps to/from OR42 (Winston) Effective April 26, 2026, the I-5 northbound Exit 119 on/off ramps to/from OR42 will be intermittently closed Sunday through Thursday nights between the hours of 6:00 PM and 6:00 AM. The estimated completion date for this work is May 13, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: MP 235.73 I-5, 2 miles North of Albany ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 5/4/2026 12:00:00 AM Details Alert: Century Dr/I-5 Frontage Rd NB & SB 235.73 (Murder Creek Bridge - Millersburg) Effective May 4, 2026, this section of Century Drive/I-5 Frontage Road northbound and southbound will be restricted to 12 feet 00 inches in width Monday through Thursday between the hours of 7:00 AM and 4:30 PM. The estimated completion date for this work is May 21, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: NB MP 248.35 I-5, 6 miles South of Intersection with ORE22, in Salem ##### Construction Work ##### Future Event: No to Minimum Delay Expected Start Date 4/14/2026 9:00:00 PM Lanes Affected (Northbound) 1 Lane Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Last Updated 4/09/2026 6:02 PM #### I-5: NB MP 248.42 to 248.73 I-5, 6 miles South of Intersection with ORE22, in Salem ##### Construction Work ##### Informational only ##### On Ramp Road construction is or will be occurring. Use caution. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. Southbound I-5 traffic to be shifted onto the former northbound lanes. Northbound I-5 traffic to use Exit 249 and the former I-5 on-ramp as the new northbound lanes. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929) Last Updated 3/30/2026 6:19 PM #### I-5: NB MP 248.65 to 249.73 I-5, 5 miles South of Intersection with ORE22, in Salem ##### Construction Work ##### Informational only ##### Off Ramp Road construction is or will be occurring. Use caution. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. Southbound I-5 traffic to be shifted onto the former northbound lanes. Northbound I-5 traffic to use Exit 249 and the former I-5 on-ramp as the new northbound lanes. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929) Last Updated 3/30/2026 6:19 PM #### I-5: NB MP 248.69 I-5, 5 miles South of Intersection with ORE22, in Salem ##### Construction Work ##### No to Minimum Delay Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929) Last Updated 3/30/2026 6:19 PM #### I-5: NB MP 249.08 to 249.85 I-5, 5 miles South of Intersection with ORE22, in Salem ##### Construction Work ##### Informational only ##### On Ramp Road construction is or will be occurring. Use caution. Ramps Affected. Expect shoulder and lane closures, construction noise and delays. Crews are mostly working during the day with occasional nighttime closures as needed. Southbound I-5 traffic to be shifted onto the former northbound lanes. Northbound I-5 traffic to use Exit 249 and the former I-5 on-ramp as the new northbound lanes. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=19929) Last Updated 2/12/2026 4:28 PM #### I-5: MP 251.79 to 248.15 I-5, 2 miles South of Intersection with ORE22, in Salem ##### Commercial Vehicle Information ##### Informational only Details Alert: I-5 NB & SB MP 248.00 to MP 252.00 (Salem) Effective August 29, 2024, this section of I-5 northbound and southbound will be intermittently restricted to 16 feet 00 inches in width Sunday through Thursday nights between the hours of 9 PM & 5 AM. The estimated completion date for this work is February 28, 2027. Last Updated 4/14/2026 4:00 PM #### I-5: NB MP 277.39 to 279.45 I-5, 5 miles North of Woodburn ##### Construction Work ##### Estimated delay under 20 minutes Road construction is occurring. Prepare to slow. Watch for workers. Crews working daily, Sunday through Thursday with occasional night and weekend work. Up to two lanes closed nightly in either direction on I-5 from 8 p.m. to 8 a.m. Other roads in the project area to have single lane closures as needed from 9 p.m. to 6 a.m. Reduced speed to 55 mph in the work zone. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=22505) Last Updated 4/10/2026 4:12 AM #### I-5: SB MP 297 to 300 I-5, Portland, Intersection with SW Terwilliger Blvd ##### Construction Work ##### Estimated delay under 20 minutes No traffic impacts. ODOT is installing RealTime Variable Advisory Speed (VAS) signs along a busy stretch of Interstate 5 through south Portland from the Ross Island Bridge to Terwilliger Boulevard. Realtime VAS signs give drivers notice to slow down before they reach a problem area — improving traffic flow and helping to reduce rear-end crashes and congestion. \<!--Links Start Here--\> \[Link to Additional Information\](https://www.oregon.gov/odot/projects/pages/project-details.aspx?project=21602) Last Updated 4/03/2026 3:49 PM #### I-5: MP 301.35 to 300.89 I-5, Interstate 84 ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 4/27/2026 12:00:00 AM Details Alert: I-5 SB MP 301.06 (Portland) Effective April 27, 2026, this section of I-5 southbound will be restricted to 14 feet 11 inches in height Sunday through Thursday nights between 10 PM & 5 AM, and Friday through Saturday nights between 10 PM & 6 AM. The estimated completion date for this work is May 18, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: MP 301.35 to 300.89 I-5, Interstate 84 ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 4/27/2026 12:00:00 AM Details Alert: I-5 SB MP 301.35 to MP 300.89 (Portland) Effective April 27, 2026, this section of I-5 southbound will be restricted to 14 feet 00 inches in width Sunday through Thursday nights between 10 PM & 5 AM, and Friday through Saturday nights between 10 PM & 6 AM. The estimated completion date for this work is May 18, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: MP 301.5 to 302.7 I-5, 1 mile South of I-405 North Interchange ##### Commercial Vehicle Information ##### Informational only Details Alert: I-5 SB MP 302.70 to MP 301.50 (Portland) Effective January 30, 2026, this section of I-5 southbound will be restricted to 14 feet 00 inches in Sunday night thru Friday night between the hours of 10 PM and 5 AM and Saturday night between the hours of 10:PM and 8:AM. Loads wider than 14 feet 00 inches may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is May 9, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: MP 301.58 I-5, I-405 North Interchange ##### Commercial Vehicle Information ##### Informational only Details Alert: I-5 SB MP 301.58 (Portland) Effective March 11, 2026, this section of I-5 southbound will be restricted to 14 feet 7 inches in height Sunday through Thursday nights between the hours of 10 PM and 5 AM. Loads over 14 feet 7 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is April 30, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: MP 301.59 to 301.96 I-5, I-405 North Interchange ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 4/20/2026 12:00:00 AM Details Alert: I-5 NB MP 301.59 to MP 301.96 (Portland) Effective April 20, 2026, this section of I-5 northbound will be restricted to 14 feet 00 inches in width Monday through Friday nights between the hours of 10 PM and 5 AM. Loads wider than 14 feet 00 inches may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is May 8, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: MP 301.6 to 302.8 I-5, I-405 North Interchange ##### Commercial Vehicle Information ##### Informational only Details Alert: I-5 SB MP 302.33 (Portland) Effective January 30, 2026, this section of I-5 southbound will be restricted to 16 feet 2 inches in height Sunday through Thursday nights between the hours of 10 PM and 5 AM. Loads over 16 feet 2 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is April 30, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: SB MP 301.85 to 301.72 I-5, I-405 North Interchange ##### Construction Work ##### No to Minimum Delay Intermittent nighttime lane closures on I-5 SB from the Convention Center to Burnside from 9 p.m. to 6 a.m. weather permitting. No detours required. We are improving safety and congestion where I-5, I-84 and I-405 converge and reconnecting the Albina neighborhood by constructing a highway cover over a portion of I-5. From summer 2025 through late 2026, we are constructing new stormwater facilities, repairing the concrete deck in a section of I-5 completing a seismic retrofit, extending an existing merging lane on SB I-5, and constructing a new sign structure. \<!--Links Start Here--\> \[Link to Additional Information\](https://i5rosequarter.org/current-construction-travel-impacts/) Last Updated 4/03/2026 4:28 PM #### I-5: MP 302.4 to 302 I-5, I-405 North Interchange ##### Commercial Vehicle Information ##### Informational only Details Alert: I-5 NB MP 302.4 to MP 302.6 (Portland) Effective April 12, 2026, this section of I-5 northbound will be restricted to 12 feet 00 inches in width at night between the hours of 10 PM & 5 AM. Loads wider than 12 feet 00 inches may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is April 16, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: MP 302.4 I-5, I-405 North Interchange ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 4/22/2026 12:00:00 AM Details Alert: I-5 NB on-ramp from NE Broadway (Portland) Effective April 22, 2026, the I-5 northbound on-ramp from NE Broadway will be restricted to 12 feet 00 inches in width at night between the hours of 10 PM & 5 AM. Loads wider than 12 feet 00 inches may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is April 26, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: MP 303.37 to 302.28 I-5, 1 mile South of Portland, Intersection with Going St ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 4/16/2026 12:00:00 AM Details Alert: I-5 SB MP 303.161 (Portland) Effective April 16, 2026, this section of I-5 southbound will be restricted to 15 feet 5 inches in height at night between the hours 10 PM & 5 AM. Loads wider than 12 feet 00 inches may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is April 22, 2026. Last Updated 4/14/2026 4:00 PM #### I-5: MP 303.37 to 302.28 I-5, 1 mile South of Portland, Intersection with Going St ##### Commercial Vehicle Information ##### Future Event: Informational only Expected Start Date 4/16/2026 12:00:00 AM Details Alert: I-5 SB MP 303.37 to MP 302.28 (Portland) Effective April 16, 2026, this section of I-5 southbound will be restricted to 12 feet 00 inches in width at night between the hours 10 PM & 5 AM. Loads wider than 12 feet 00 inches may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is April 22, 2026. Last Updated 4/14/2026 4:00 PM
Shard107 (laksa)
Root Hash12421951247662197107
Unparsed URLcom,tripcheck!www,/DynamicReports/Report/RoadConditions s443